<?xml version="1.0" encoding="UTF-8"?><?xml-model type="application/xml-dtd" href="http://jats.nlm.nih.gov/publishing/1.1d3/JATS-journalpublishing1.dtd"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.1d3 20150301//EN" "http://jats.nlm.nih.gov/publishing/1.1d3/JATS-journalpublishing1.dtd">
<article xmlns:ali="http://www.niso.org/schemas/ali/1.0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" dtd-version="1.1d3" specific-use="Marcalyc 1.2" article-type="research-article" xml:lang="pt">
<front>
<journal-meta>
<journal-id journal-id-type="redalyc">4716</journal-id>
<journal-title-group>
<journal-title specific-use="original" xml:lang="pt">Revista de Gestão Ambiental e Sustentabilidade</journal-title>
<abbrev-journal-title abbrev-type="publisher" xml:lang="pt">GeAS</abbrev-journal-title>
</journal-title-group>
<issn pub-type="epub">2316-9834</issn>
<publisher>
<publisher-name>Universidade Nove de Julho</publisher-name>
<publisher-loc>
<country>Brasil</country>
<email>revistageas@uninove.br</email>
</publisher-loc>
</publisher>
</journal-meta>
<article-meta>
<article-id pub-id-type="art-access-id" specific-use="redalyc">471647049002</article-id>
<article-id pub-id-type="doi">https://doi.org/10.5585/geas.v5i2.384</article-id>
<article-categories>
<subj-group subj-group-type="heading">
<subject>Artigos</subject>
</subj-group>
</article-categories>
<title-group>
<article-title xml:lang="pt">A utilização do shadow e do silent reports como instrumentos de evidenciação das informações socioambientais: o caso da usina hidrelétrica de Belo Monte</article-title>
</title-group>
<contrib-group>
<contrib contrib-type="author" corresp="no">
<name name-style="western">
<surname>Rocha dos Santos</surname>
<given-names>Rodolfo</given-names>
</name>
<xref ref-type="aff" rid="aff1"/>
<email>rodolfo.rocha87@hotmail.com</email>
</contrib>
<contrib contrib-type="author" corresp="no">
<name name-style="western">
<surname>Alvaro da Silva Macedo</surname>
<given-names>Marcelo</given-names>
</name>
<xref ref-type="aff" rid="aff2"/>
<email>malvaro.facc.ufrj@gmail.com</email>
</contrib>
<contrib contrib-type="author" corresp="no">
<name name-style="western">
<surname>Lima Marques</surname>
<given-names>Alessandra</given-names>
</name>
<xref ref-type="aff" rid="aff3"/>
<email>alessandramarques@facc.ufrj.br</email>
</contrib>
<contrib contrib-type="author" corresp="no">
<name name-style="western">
<surname>Flach</surname>
<given-names>Leonardo</given-names>
</name>
<xref ref-type="aff" rid="aff4"/>
<email>leoflach@cse.ufsc.br</email>
</contrib>
</contrib-group>
<aff id="aff1">
<institution content-type="original">Universidade Federal de Santa Catarina – UFSC,
Brasil 

E-mail: rodolfo.rocha87@hotmail.com</institution>
<institution content-type="orgname">Universidade Federal de Santa Catarina </institution>
<country country="BR">Brasil</country>
</aff>
<aff id="aff2">
<institution content-type="original">Universidade Federal do Rio de Janeiro – UFRJ,
Brasil 

E-mail: malvaro.facc.ufrj@gmail.com</institution>
<institution content-type="orgname">Universidade Federal do Rio de Janeiro</institution>
<country country="BR">Brasil</country>
</aff>
<aff id="aff3">
<institution content-type="original">Universidade Federal do Rio de Janeiro – UFRJ,
Brasil 

E-mail: alessandramarques@facc.ufrj.br</institution>
<institution content-type="orgname">Universidade Federal do Rio de Janeiro</institution>
<country country="BR">Brasil</country>
</aff>
<aff id="aff4">
<institution content-type="original">Universidade Federal de Santa Catarina – UFSC,
Brasil 

E-mail: leoflach@cse.ufsc.br</institution>
<institution content-type="orgname">Universidade Federal de Santa Catarina</institution>
<country country="BR">Brasil</country>
</aff>
<pub-date pub-type="epub-ppub">
<season>May-August</season>
<year>2016</year>
</pub-date>
<volume>5</volume>
<issue>2</issue>
<fpage>1</fpage>
<lpage>18</lpage>
<history>
<date date-type="received" publication-format="dd mes yyyy">
<day>17</day>
<month>07</month>
<year>2015</year>
</date>
<date date-type="accepted" publication-format="dd mes yyyy">
<day>31</day>
<month>03</month>
<year>2016</year>
</date>
</history>
<permissions>
<copyright-year>2012</copyright-year>
<copyright-holder>Universidade Nove de Julho</copyright-holder>
<ali:free_to_read/>
<license xlink:href="https://creativecommons.org/licenses/by-nc-sa/4.0/">
<ali:license_ref>https://creativecommons.org/licenses/by-nc-sa/4.0/</ali:license_ref>
<license-p>Esta obra está bajo una Licencia Creative Commons Atribución-NoComercial-CompartirIgual 4.0 Internacional.</license-p>
</license>
</permissions>
<self-uri content-type="pdf" xlink:href="https://periodicos.uninove.br/index.php?journal=geas&amp;page=article&amp;op=view&amp;path%5B%5D=9998&amp;path%5B%5D=4691">https://periodicos.uninove.br/index.php?journal=geas&amp;page=article&amp;op=view&amp;path%5B%5D=9998&amp;path%5B%5D=4691</self-uri>
<abstract xml:lang="pt">
<title>Resumo</title>
<p>   O Shadow (sombra) e o Silent (silencioso) Reports são dois instrumentos sugeridos para a melhoria da divulgação das informações socioambientais. Esta pesquisa tem como objetivo analisar a partir do shadow e silent reports as informações socioambientais divulgadas pela empresa Norte Energia S.A. sobre a construção da Usina Hidrelétrica de Belo Monte na Volta Grande do Xingu. Neste estudo, de característica qualitativa e descritiva, foram coletados e analisados os seguintes dados para a construção dos relatórios sombra e silencioso: o tratamento das contingências socioambientais; a mitigação dos impactos ambientais – o impacto na ictiofauna (peixes) da Volta Grande do Xingu; crescimento populacional do município de Altamira. Constatou-se que houve um tratamento dentro da realidade por parte da Norte Energia S.A., e que as normas brasileiras de contabilidade foram obedecidas quanto ao tratamento das contingências. Há um caráter experimental a respeito dos projetos de mitigação dos impactos ambientais ocasionados na ictiofauna da região. Identificou-se também uma divergência significativa entre o relatório sombra e o relatório silencioso em relação ao crescimento populacional do município de Altamira.  </p>
</abstract>
<trans-abstract xml:lang="en">
<title>Abstract</title>
<p>          The Shadow Report and the Silent Report are two suggested tools to improve the environmental information. This research aims to analyze the shadow and silent reports disclosed by the Norte Energia corporation about the construction of the Belo Monte hydroelectric plant in Volta Grande do Xingu. In this study, qualitative and descriptive characteristics were collected and analysed. The following data were analysed for the construction of Shadow and Silent Reports: the treatment of environmental contingencies; the mitigation of environmental impact - the impact on Volta Grande do Xingu’s icthyofauna (fish); population growth in the region of Altamira. We found that the Brazilian accounting standards have been followed by Norte Energia. There is a trial basis about the mitigation projects of environmental impact on fish on the region. We also identified a significant divergence between the Shadow and  Silent Report findings with relation to population growth in the region of Altamira.  </p>
</trans-abstract>
<trans-abstract xml:lang="es">
<title>Resumen</title>
<p>          El Shadow (sombra) y Silent (silenciosos) Reports son dos instrumentos sugeridos para mejorar la divulgación de las informaciones ambientales. Esta investigación tiene como objetivo analizar desde El shadow y silent reports las informaciones ambientales divulgadas por la empresa norte Energía S.A. en la construcción de la planta hidroeléctrica de Belo Monte en Volta Grande do Xingu. En este estudio, cualitativo y descriptivo, se recogerán y analizaran los siguientes datos para la construcción de los informes de sombra y silencio: El tratamiento de contingencias socio ambientales; mitigación de impactos ambientales - el impacto en la fauna (peces) de la Volta Grande do Xingu; crecimiento de la población del municipio de Altamira. Se observó que había un tratamiento dentro de la realidad de Norte Energía S.A., y que las normas brasileras de contabilidad experimentales no han sido seguidas cuanto al tratamiento de contingencias. Hay un carácter experimental en proyectos de mitigación de impactos ambientales causados en la fauna. También identificaron una divergencia importante entre la sombra y el silencio informe en relación con El crecimiento de la población del municipio de Altamira.  </p>
</trans-abstract>
<kwd-group xml:lang="pt">
<title>Palavras-chave</title>
<kwd>Relatório Sombra</kwd>
<kwd> Relatório Silencioso</kwd>
<kwd> Evidenciação Ambiental</kwd>
</kwd-group>
<kwd-group xml:lang="en">
<title>Keywords</title>
<kwd>Shadow Report</kwd>
<kwd> Silent report</kwd>
<kwd> Environmental Disclosure</kwd>
</kwd-group>
<kwd-group xml:lang="es">
<title>Palabras clave</title>
<kwd>Informe Sombra</kwd>
<kwd> Informe de silencio</kwd>
<kwd> Divulgación de información ambiental</kwd>
</kwd-group>
<counts>
<fig-count count="0"/>
<table-count count="8"/>
<equation-count count="0"/>
<ref-count count="28"/>
</counts>
</article-meta>
</front>
<body>
<sec>
<title>
<bold>INTRODUÇÃO</bold>
</title>
<p> Uma maior preocupação com o meio ambiente por parte da sociedade em geral faz com que as organizações sejam pressionadas a divulgar informações que demonstrem sua interação com o meio ambiente. Diante desse cenário, a comunidade científica e a sociedade vêm empreendendo esforços com o intuito de promover a melhoria da transparência das empresas quanto às informações de evidenciação ambiental.</p>
<p> De acordo com Rosa et al. (2011), as empresas utilizam a evidenciação ambiental para prestar contas à sociedade em geral. Monteiro (2007) demonstra que a comunicação de caráter ambiental vem chamando a atenção não somente dos usuários da informação (stakeholders) com distinto poder de decisão sobre a empresa, mas também de pesquisadores da área da Contabilidade social e ambiental. Lins e Silva (2010) ainda afirmam que a evidenciação exerce uma importante função de comunicação sobre o desempenho empresarial e seus stakeholders. Portanto, possui papel essencial na redução da assimetria de informação entre os gestores e aqueles que possuem interesse na empresa, principalmente os investidores.</p>
<p> Nas últimas décadas houve uma ascensão das práticas de evidenciação ambiental como forma de procurar atender aos anseios dos usuários desse tipo de informação, não mais restrita ao nível organizacional do processo decisório corporativo (Moreira, 2012). Nesse sentido, a Contabilidade auxilia a suprir informações desse âmbito.</p>
<p> Como forma de controlar, reduzir ou minimizar impactos socioambientais, surge a concepção de um modelo básico para as contas de silêncio (silent) e de sombra (shadow) que integrem padrões e formatos de divulgação (Collison et al., 2010).</p>
<p> Os relatórios sombra e silencioso configuram técnicas que a contabilidade utiliza para identificar diferenças entre o desempenho socioambiental observado pelos usuários interessados nas atividades da empresa (shadow report) e o desempenho que as empresas alegam ter alcançado por meio de suas demonstrações e relatórios divulgados publicamente (silent report). A sua construção, de acordo com Moreira (2012), é uma importante ferramenta para a melhoria da divulgação de informações socioambientais por parte da Contabilidade. </p>
<p> O surgimento dos relatórios sombra e silencioso deve-se ao potencial emancipatório e seus efeitos educativos sobre a qualidade dos reportes socioambientais corporativos que ambos proporcionam (Dai, 2010). O fato de as informações utilizadas em ambos os relatórios já se encontrarem disponíveis em fontes públicas torna sua construção uma atividade econômica por parte da Contabilidade.</p>
<p> Dessa maneira, de acordo com o contexto apresentado, o presente trabalho tem como objetivo analisar as informações socioambientais divulgadas pela empresa Norte Energia S.A., a partir da construção de uma proposta adaptada do shadow e silent reports. No presente artigo optou-se primeiro pela construção do shadow report e com base em suas informações construiu-se o silent report utilizando-se a metodologia “corte-e-cola” conforme Hamling et al. (2006) e Moreira (2012). Dessa maneira, preservam-se os anseios dos principais interessados em informações desse caráter, no caso os stakeholders (Hamling et al., 2006; Moreira, 2012). A escolha da Norte Energia S.A. deu-se por conta da construção da Usina Hidrelétrica de Belo Monte e todos os impactos socioambientais que uma construção de tal magnitude traz consigo.</p>
<p> Assim, a pesquisa pode contribuir para a disseminação do conhecimento e ampliação das práticas de transparência socioambiental. Os resultados desta pesquisa subsidiam as divulgações das informações socioambientais por parte da contabilidade.</p>
<sec>
<title>
<bold>REVISÃO DE
LITERATURA</bold>
</title>
<p> Moreira (2012) chama a atenção para práticas de evidenciações ambientais obrigatórias e voluntárias. Os defensores da evidenciação obrigatória afirmam que a regulamentação da divulgação ambiental melhora a qualidade da prestação de contas ambiental, por garantir um mínimo de divulgação das informações desse caráter (Maltby, 1997). Desse modo, a regulamentação incita as empresas no sentido de melhorar sua eficiência, abraçar e desenvolver tecnologias, ou aperfeiçoar as existentes, e uma consciência ambiental corporativa (Moreira, 2012). Os autores que defendem esse tipo de divulgação enfatizam a necessidade de um quadro jurídico de base, a fim de promover um nível de sofisticação comparável com os sistemas de relatórios financeiros obrigatórios (Hahn; Kühnen, 2013) Porém, Ribeiro (2009) aponta que uma das maiores desvantagens da evidenciação ambiental obrigatória está no aspecto da conformidade, a qual se refere à limitação de a divulgação ficar restrita somente ao que é exigido pela regulamentação, resultando na não divulgação ambiental voluntária por parte das empresas.</p>
<p> Quanto às motivações a favor da evidenciação ambiental voluntária é que um relatório obrigatório não poderia suprir as demandas informacionais diversas de todos os stakeholders (Azzone et al., 1997). De acordo com Holland &amp; Foo (2003), a informação voluntária pode apresentar mais transparência em relação à divulgação por pressões regulatórias. Moreira (2012) afirma que a evidenciação voluntária proporciona inovações e a busca por valores fundamentais. Já Pereira, Luz &amp; Carvalho (2015) afirmam que, de acordo com a teoria da divulgação voluntária, somente as empresas que obtiveram desempenho ambiental positivo estariam realizando a divulgação voluntária das informações ambientais, e aquelas que obtiveram desempenho negativo optariam por não se expor. Levy et al. (2010) ainda criticam as diretrizes dos relatórios voluntários por conta de serem muito genéricos, sem medidas quantificáveis, portanto, não satisfazem as necessidades de informações dos stakeholderes. De acordo com Hahn &amp; Kühnen (2013), os autores que repreendem o uso da evidenciação voluntária a questionam por conta da possível falsa imagem da governança corporativa passada aos stakeholders.</p>
<p> Dentro das limitações das posições sobre o caráter da evidenciação ambiental, ainda há certa resistência por parte das empresas em divulgar seus informes sociais. Porém, verificou-se, nos relatórios anuais divulgados pelas organizações, a existência não desprezível de informações silenciosas que representaram uma reconstrução social interessante delas (Gibson et al., 2001).</p>
<p> Tendo em vista que a responsabilidade social é um acordo entre a empresa e seus stakeholders, o relatório silencioso e o relatório sombra surgem a fim de fornecer informações aos usuários, tanto do ponto de vista da empresa (silencioso) quanto do ponto de vista dos stakeholders (sombra) (Zikri, 2009). </p>
<p> De acordo com Dai (2010), o shadow e o silent reports consistem em uma técnica da contabilidade em que grupos ou indivíduos fornecem um relatório alternativo sobre a prática de uma organização. Tais relatórios, que normalmente contêm informações negativas elaboradas a partir da mídia e da população, são uma força alternativa ou meios para desafiar corporações através de relatórios sociais e ambientais que muitas vezes revelam a seleção de “boas notícias” (Bebbington et al., 2007; Dey, 2003; Ruffing, 2007; Dai, 2010). Dessa maneira, o relatório sombra e o relatório silencioso podem fornecer novos insights sobre os impactos sociais e ambientais de uma organização e revelar contradições entre o que eles escolhem relatar e o que eles escolhem omitir ou suprimir (Collison et al., 2010).</p>
<p> Segundo Moreira (2012), relatório sombra é um dos métodos utilizados pela contabilidade para construir mais informações que auxiliem os stakeholders em suas perspectivas sobre as práticas e ações de uma empresa, em que grupos ou indivíduos fornecem relatórios alternativos. É a partir do contraste entre o relatório socioambiental oficial da entidade e qualquer informação relevante sobre a empresa divulgada por meio de canais externos de comunicação e mídia que se constrói o relatório sombra.</p>
<p> A construção do relatório silencioso se dá por meio da comparação entre o relatório socioambiental corporativo oficial e informações divulgadas pela própria entidade por outros canais de comunicação, canais esses de domínio público (Dey, 2003). Moreira (2012) complementa que o relatório silencioso representa o relato e o discurso da entidade sobre suas atividades socioambientais declarados por ela.</p>
<p> Os relatórios sombra e silencioso têm como objetivo identificar as diferenças no que diz respeito ao desempenho socioambiental percebido por terceiros e o desempenho socioambiental que as entidades afirmam atingir por meio de suas contas e relatórios divulgados publicamente, e melhorar a transparência da informação contábil (Dey, 2003). Porém, o objetivo explícito para identificar essas diferenças não é a única expectativa dos acadêmicos de contabilidade quanto ao uso dos relatórios sombra e silencioso, em que eles também podem auxiliar a combater o discurso hegemônico dos relatórios socioambientais corporativos que configuram a realidade atual (Bebbington et al., 2007; Dai, 2010). Bebbington et al. (2007) esclarecem que esse objetivo consiste em alargar o número e os tipos de histórias que são contadas e os atores que as dizem, em vez de substituir uma história existente. O autor ainda complementa que o shadow e o silent reports podem ser vistos como uma forma eficaz para antagonizar corporações, quebrando esse monopólio da divulgação, desenvolver capacidades reforçadas para a reflexão crítica e para, eventualmente, conseguir um efeito emancipatório e educativo.</p>
<p> Dey (2003) afirma que uma das justificativas da elaboração de ambos os relatórios é o seu custo/benefício favorável, por conta de não necessitar de trabalhos dispendiosos para sua concepção. Eles podem ser produzidos rapidamente e em grande quantidade, já que não existe a necessidade de nenhum acesso ou permissão a dados e informações da organização investigada. O autor evidencia que é na identificação das informações de caráter socioambiental no conjunto dos relatórios anuais, demonstrações financeiras e demais documentos societários que se tem o ponto de partida para a construção do relatório silencioso. Não há, portanto, qualquer ruído ou interferência externa (extracorporativa) a essa comunicação realizada pela corporação ao público e para as partes interessadas. Moreira (2012) diz que tal abordagem demonstra o quanto pode ser barato, simples e rápido agrupar as informações necessárias, a partir dos dados da própria entidade em questão, para se construir o relatório silencioso. </p>
<p> Um dos desafios a serem superados em relação ao relatório silencioso, apontado por Dey (2003), é que o padrão de adesão a um exercício social adotado pela classe contábil pode vir a ser um empecilho no que diz respeito a termo de coleta e organização de informações socioambientais divulgados pela entidade. </p>
<p> Como evidencia Dey (2003), não há um método específico para a elaboração dos relatórios sombra e silencioso. Esse tipo de padronização está em construção, porém pode-se extrair algumas contribuições importantes a partir de experiência de alguns autores.</p>
<p> Um exemplo disso foi o trabalho apresentado por Hamling et al. (2006), em que os autores adotaram o processo de “cortar-e-colar” dos relatórios da entidade divulgados, a fim de reduzir a possível influência de vieses dos autores na elaboração do relatório silencioso.</p>
<p> O relatório sombra é elaborado com base em informações externas e independentes do controle da organização, construído por diversas fontes e canais de comunicação diferentes como: relatórios externos, reportagens, informações de terceiros em geral etc., ressaltando que não sejam informações publicadas pela empresa e voltadas para o público interessado em seus relatórios (Zikri, 2009; Collison et al., 2010).</p>
<p> Com o relatório sombra, muda a perspectiva antes voltada para a organização, e as prestações de contas passam a ser mais independentes e com uma visão voltada aos anseios dos stakeholders (Moreira, 2012). O autor levanta a questão de o relatório sombra ter um caráter subjetivo e litigioso e de que há a necessidade da confiabilidade das informações utilizadas para sua concepção. O tipo e porte da entidade em questão também são variáveis que influenciam consideravelmente nesse aspecto. </p>
<p> Nesse sentido, por possuir essa natureza suscetível à subjetividade, que pode acarretar a distorção desse relatório, os autores sugerem o empreendimento de esforços no que diz respeito à diversificação das fontes de coleta de dados e pulverização do horizonte de captura das informações na finalidade de garantir alguma imparcialidade ao âmago do relatório sombra (Hamling et al., 2006).  </p>
<p> Gibson et al. (2001), os formuladores da proposta dos relatórios sombra e silencioso, aplicaram essa proposta para cinco empresas do Reino Unido, sem emitirem nenhuma opinião sobre as informações publicadas, tanto no relatório sombra quanto no relatório silencioso. O intuito de Gibson et al. (2001) era verificar as possíveis reações, tanto das empresas exploradas quanto dos stakeholders envolvidos, quando da construção de tais relatórios. Eles constataram que profissionais de Organizações Não Governamentais (ONG) e de Investimento Socialmente Responsável (ISR) expressaram interesse nesse tipo de informação, justificando a continuidade dos seus projetos.</p>
<p> Hamling et al. (2006) construíram um relatório sombra e silencioso para a empresa de aviação irlandesa Ryanair sobre quatro vertentes socioambientais: emprego, clientes, comunidade e meio ambiente. No que diz respeito ao emprego, os autores perceberam que a Ryanair prioriza suas metas de alcançar lucros e praticar tarifas baixas em detrimento de manter e criar boas relações com seus funcionários. Quanto à vertente clientes, percebeu-se uma relutância da empresa de mudar suas políticas de atendimento ao cliente, mesmo que a companhia tenha sido citada em uma pesquisa de viajantes de todo o mundo como a pior companhia aérea. Em relação à comunidade, as práticas adotadas pela Ryanair em atingir eficiência surtiram efeitos positivos quanto aos impactos na comunidade. Por fim, quanto ao meio ambiente, os autores perceberam que, por querer se tornar uma empresa de máxima eficiência e maximização de lucro, os impactos ambientais positivos são apenas um bônus, um efeito da utilização de tecnologia de menor impacto ambiental. Hamling et al. (2006) enfatizam que a Ryanair nunca priorizou o meio ambiente em seus objetivos.</p>
<p> Zikri (2009) aplicou a proposta do relatório sombra e silencioso para a empresa Freeport – McMoran Copper &amp; Gold Inc., empresa do ramo de mineração e exploração de ouro, cobre e molibdênio. O estudo da autora se concentrou sobre a filial da empresa em Papua, na Indonésia, por conta dos danos ambientais ocasionados pela entidade e denunciados pela sociedade. A autora chegou à conclusão de que o sistema de gestão ambiental da empresa não evita a ocorrência dos impactos ambientais. A Freeport declarou que, pelo sistema de gerenciamento de rejeitos, o local pode ser recuperado com vegetação natural ou usado para cultivo. Entretanto, Zikri (2009) percebeu que na realidade alguns rios estão contaminados com poluentes químicos.</p>
<p> Dai (2010) buscou verificar os impactos do relatório sombra e relatório silencioso sobre os relatórios socioambientais de algumas organizações. Os impactos de ambos os relatórios foram investigados de acordo com a existência, natureza e eficácia dos impactos, respectivamente. Para tanto, o autor valeu-se de relatórios sombras criados por o que ele chamou de dois sites. O Site um foi o relatório sombra criado pela ONG Save Happy Valley Coalition (SHVC) para a empresa Solid Energy New Zealand Ltd (Solid Energy). O Site dois, composto por relatórios sombra promovidos pelas ONGs Action on Smoking, Health (ASH), Friends of the Earth (FoE) e Christian Aid sobre a segunda maior empresa de tabaco do mundo, a British American Tobacco (BAT). O autor conclui que o relatório sombra tem a capacidade de realizar mudanças nos relatórios socioambientais corporativos. Quanto ao site um, o autor mostrou que quatro das sete questões estudadas apresentaram um razoável progresso imediato e contínuo nos relatórios corporativos pós-relatório sombra. Já no site dois, quatro das cinco questões levantadas pelo relatório sombra alcançaram fortes respostas logo no relatório posterior da BAT.</p>
<p> Moreira (2012) aplicou uma proposta adaptada do relatório sombra e silencioso para o setor elétrico como instrumento de melhoria da qualidade informacional dos repórteres sobre o desempenho socioambiental de um grupo de empresas do sistema Eletrobrás. O autor identificou um baixo nível de prestações de contas socioambientais na comparação e verificação entre o que a corporação comunica e o que divulgam fontes de terceiros.</p>
<p> Assim, com base no assunto abordado sobre os impactos socioambientais e a responsabilidade da contabilidade quanto às práticas de evidenciação ambiental e social, esta pesquisa tem o intuito de aplicar uma proposta adaptada do relatório sombra e do relatório silencioso. Tais relatórios podem exercer um papel de suporte para os principais interessados nas ações socioambientais das entidades e seus impactos, podem contribuir no desenvolvimento e aperfeiçoamento da qualidade da informação divulgada pela Norte Energia S.A.</p>
<sec>
<title>
<bold>METODOLOGIA  

 </bold>
</title>
<p> A pesquisa se caracteriza como predominantemente descritiva quanto aos objetivos. Quanto aos procedimentos adotados, a mesma se caracteriza como documental, e baseia-se nas reportagens de fontes de informações externas, relatórios e documentos divulgados pela empresa. Sobre a abordagem do problema, a pesquisa se caracteriza como qualitativa, pois requer a compreensão da natureza de um fenômeno social (Raupp; Beuren, 2003).</p>
<p> Esta pesquisa teve como escolha de objeto de pesquisa a empresa Norte Energia S.A., empresa de propósito específico, propósito esse de construir e gerir a concessão da Usina Hidrelétrica de Belo Monte, na Volta Grande do Xingu. A pesquisa limitou-se a explorar informações de cunho socioambiental conforme definição do Pacto Global da ONU (Moreira, 2012). </p>
<p> A proposta da Hidrelétrica de Belo Monte é voltada de grande controvérsia graças à grandiosidade do projeto e seus prováveis impactos que a construção que uma hidrelétrica desse tamanho pode gerar no meio ambiente e na população ao seu entorno (Fearnside, 2010). </p>
<p> A Usina Hidrelétrica de Belo Monte será a terceira maior hidrelétrica do mundo, e está cercada de inúmeras pressões sociais e polêmicas em torno de sua construção. Tal fato motivou a realização desta pesquisa, devido aos impactos socioambientais que uma obra dessa magnitude ocasiona. Limitou-se um corte temporal de janeiro de 2013 a dezembro de 2013, com exceção de uma informação extraída em 03 de setembro de 2014 utilizada no Quadro 07 desta pesquisa. O levantamento de dados ocorreu via internet pela facilidade de acesso aos dados e baixo custo para divulgação das informações de natureza socioambiental, tanto para a construção do shadow report quanto para o silent report.</p>
<p> Vale ressaltar que, ao se elaborar os relatórios sombra e silencioso da empresa Norte Energia S.A., primeiro construiu-se o relatório sombra com origem em informações que, a priori, refletem os interesses dos stakeholders no cunho das informações socioambientais. Assim, manteve-se o propósito de fornecer informações de acordo com os anseios dos principais interessados por tais informações. Caso contrário, ter-se-ia o risco de a pesquisa não dispor do senso crítico necessário, dado que o relatório silencioso poderia estar repleto de informações que não ditam os principais interesses dos stakeholders, principalmente aqueles com menor poder de influência (Hamling et al., 2006; Moreira, 2012).</p>
<p> Para a compilação do relatório sombra procurou-se usar o maior número de informações possíveis de terceiros, tanto de fontes de abrangência nacional quanto de abrangência regional e local, a partir de canais de órgãos públicos e empresas privadas de informação a fim de se manter uma maior imparcialidade (Dey, 2003; Moreira, 2012). </p>
<p> Para a construção do relatório sombra foram selecionados os seguintes canais de informações tanto de abrangência nacional quanto regional:</p>
<p>
<table-wrap id="gt1">
<label>Quadro 01</label>
<caption>
<title>Relação dos canais de
informações externos</title>
</caption>
<alt-text>Quadro 01  Relação dos canais de
informações externos</alt-text>
<alternatives>
<graphic xlink:href="471647049002_gt2.png" position="anchor" orientation="portrait"/>
<table style="width:16.0cm;border-collapse:collapse;" id="gt2-526564616c7963">
<tbody>
<tr style="height:13.6pt">
<td style="width:253.95pt;border-top:solid windowtext 1.0pt;   border-left:solid windowtext 1.0pt;border-bottom:none;border-right:none;      padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt">
  Jornais de abrangência nacional
  </td>
<td style="width:199.65pt;border-top:solid windowtext 1.0pt;   border-left:none;border-bottom:none;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt">
  SÍTIO
  </td>
</tr>
<tr style="height:13.6pt">
<td style="width:253.95pt;border:none;   border-left:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt">
  Folha de S. Paulo
  </td>
<td style="width:199.65pt;border:none;   border-right:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt">
  http://www.folha.uol.com.br/
  </td>
</tr>
<tr style="height:13.6pt">
<td style="width:253.95pt;border:none;   border-left:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt">
  O Estado de S. Paulo
  </td>
<td style="width:199.65pt;border:none;   border-right:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt">
  http://www.estadao.com.br/
  </td>
</tr>
<tr style="height:13.6pt">
<td style="width:253.95pt;border:none;   border-left:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt">
  Blog
  </td>
<td style="width:199.65pt;border:none;   border-right:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt"/>
</tr>
<tr style="height:13.6pt">
<td style="width:253.95pt;border:none;   border-left:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt">
  Blog da Hidrelétrica Belo Monte
  </td>
<td style="width:199.65pt;border:none;   border-right:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt">
  http://blogbelomonte.com.br/
  </td>
</tr>
<tr style="height:13.6pt">
<td style="width:253.95pt;border:none;   border-left:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt">
  Agências reguladoras estaduais de serviços públicos
  </td>
<td style="width:199.65pt;border:none;   border-right:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt"/>
</tr>
<tr style="height:13.6pt">
<td style="width:253.95pt;border:none;   border-left:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt">
  Ministério Público do Pará
  </td>
<td style="width:199.65pt;border:none;   border-right:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt">
  http://www.mppa.mp.br/
  </td>
</tr>
<tr style="height:13.6pt">
<td style="width:253.95pt;border:none;   border-left:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt">
  Procuradoria da República do Pará
  </td>
<td style="width:199.65pt;border:none;   border-right:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt">
  http://www.prpa.mpf.mp.br/
  </td>
</tr>
<tr style="height:13.6pt">
<td style="width:253.95pt;border-top:none;   border-left:solid windowtext 1.0pt;border-bottom:solid windowtext 1.0pt;   border-right:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt">
  Prefeitura de Altamira
  </td>
<td style="width:199.65pt;border-top:none;   border-left:none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:13.6pt">
  http://altamira.pa.gov.br/portal/
  </td>
</tr>
</tbody>
</table>
</alternatives>
<attrib>elaboração própria</attrib>
</table-wrap>
</p>
<p> Vale ressaltar que foram utilizados canais de informação de abrangência local (como Altamira Hoje e OXingu), mas ambos replicavam informações de canais de informação com maior circulação, como a Folha de S. Paulo e do próprio Ministério Público do Pará.</p>
<p> A busca de informações se limitou no uso das terminologias “Norte Energia”, “Belo Monte” e “Altamira” no sistema interno de cada sítio consultado. Foi feito o uso do sinal gráfico de aspas nos termos para que nos resultados apresentassem no texto a citação da referida expressão (Moreira, 2012). Após a busca foi feita a leitura de cada notícia que incluísse os termos pesquisados e dentre elas selecionaram-se as de cunho socioambiental relacionadas com a empresa Norte Energia S.A. Posteriormente, foram selecionadas as seguintes informações socioambientais: o tratamento das contingências socioambientais; mitigação dos impactos ambientais – o impacto na ictiofauna (peixes) da Volta Grande do Xingu; crescimento populacional no município de Altamira. Vale ressaltar que essas variáveis foram também utilizadas por Moreira (2012), com exceção do crescimento populacional. Esta última foi selecionada por conta de inúmeros impactos ocasionados por tamanho crescimento populacional no município de Altamira.</p>
<p> A partir das informações do relatório sombra foi construído o relatório silencioso, utilizando a metodologia de “corta-e-cola” aplicada por Hamling et al. (2006) e Moreira (2012), para reduzir possível viés provocado pela influência dos autores na construção do devido relatório.</p>
<p>
<table-wrap id="gt2">
<label>Quadro 2</label>
<caption>
<title>Shadow e Silent
Report</title>
</caption>
<alt-text>Quadro 2 Shadow e Silent
Report</alt-text>
<alternatives>
<graphic xlink:href="471647049002_gt3.png" position="anchor" orientation="portrait"/>
<table style="width:511.3pt;margin-left:-42.8pt;border-collapse:collapse;" id="gt3-526564616c7963">
<tbody>
<tr style="height:12.2pt">
<td style="width:70.9pt;border-top:solid windowtext 1.0pt;   border-left:solid windowtext 1.0pt;border-bottom:double windowtext 2.25pt;   border-right:none;   padding:0cm 3.5pt 0cm 3.5pt;height:12.2pt">
  Perspectiva
  </td>
<td style="width:301.2pt;border-top:solid windowtext 1.0pt;   border-left:none;border-bottom:double windowtext 2.25pt;border-right:none;      padding:0cm 3.5pt 0cm 3.5pt;height:12.2pt">
  Variáveis
  </td>
<td style="width:139.2pt;border-top:solid windowtext 1.0pt;   border-left:none;border-bottom:double windowtext 2.25pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;   height:12.2pt">
  Fonte
  </td>
</tr>
<tr style="height:41.4pt">
<td style="width:70.9pt;border-top:none;border-left:   solid windowtext 1.0pt;border-bottom:solid black 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;   height:41.4pt" rowspan="3">
  Shadow Report
  </td>
<td style="width:301.2pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:41.4pt">
  Contingência
  Socioambiental – Buscaram-se notícias
  sobre processos de caráter social ou ambiental movidos pelo Ministério
  Público do Estado do Pará contra a Norte Energia S.A.
  </td>
<td style="width:139.2pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:41.4pt">
  http://www.mppa.mp.br/
  http://www.prpa.mpf.mp.br/
  </td>
</tr>
<tr style="height:40.7pt">
<td style="width:301.2pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:40.7pt">
  Impacto na
  Ictiofauna - Tendo a pesca e a venda de
  peixes ornamentais como principais fontes de renda da população ribeirinha da
  Volta Grande do Xingu, e os grandes impactos ocasionados na fauna de peixes
  por uma construção desse caráter como a de Belo Monte, buscaram-se notícias
  em canais de terceiros que remetessem aos impactos na ictiofauna da região.
  </td>
<td style="width:139.2pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:40.7pt">
  http://www.folha.uol.com.br/
  http://www.estadao.com.br/
  http://blogbelomonte.com.br/
  http://altamira.pa.gov.br/portal/
  </td>
</tr>
<tr style="height:50.9pt">
<td style="width:301.2pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:50.9pt">
  Crescimento
  Populacional - Um dos impactos gerados
  pela construção do empreendimento da Usina Hidrelétrica de Belo Monte foi a
  migração populacional para o município de Altamira (maior município na região
  da Volta Grande do Xingu), o que acarreta inúmeros impactos no município, que
  não apresenta uma infraestrutura adequada para tanto. Buscaram-se notícias em
  canais de terceiros que remetessem ao crescimento populacional desenfreado no
  município de Altamira.
  </td>
<td style="width:139.2pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:50.9pt">
  http://www.folha.uol.com.br/
  http://www.estadao.com.br/
  http://blogbelomonte.com.br/
  http://altamira.pa.gov.br/portal/
  </td>
</tr>
<tr style="height:40.7pt">
<td style="width:70.9pt;border-top:none;border-left:   solid windowtext 1.0pt;border-bottom:solid black 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;   height:40.7pt" rowspan="3">
  Silent Report
  </td>
<td style="width:301.2pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:40.7pt">
  Contingência
  Socioambiental – Buscou-se nas
  Demonstrações Financeiras da Norte Energia S.A., principalmente em seu
  Balanço Social, o tratamento das contingências de acordo com o Comitê de
  Pronunciamentos Contábeis (CPC) 25. Também se procuraram notícias de cunho no
  canal de relacionamento com investidor da empresa.
  </td>
<td style="width:139.2pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:40.7pt">
  http://norteenergiasa.com.br/site/
  </td>
</tr>
<tr style="height:50.9pt">
<td style="width:301.2pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:50.9pt">
  Impacto na
  Ictiofauna – Buscaram-se notícias
  divulgadas pela empresa Norte Energia S.A. em seu canal de relacionamento com
  o investidor e em seus relatórios financeiros (Demonstrações Financeiras,
  Balanço Social, Relatório da Administração) notícias, notas ou algum tipo de
  evidenciação sobre o andamento dos projetos de mitigação dos impactos
  ambientais na ictiofauna da Volta Grande do Xingu.
  </td>
<td style="width:139.2pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:50.9pt">
  http://norteenergiasa.com.br/site/
  </td>
</tr>
<tr style="height:30.5pt">
<td style="width:301.2pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:30.5pt">
  Crescimento
  Populacional – Buscaram-se notícias
  divulgadas pela Norte Energia S.A. em seu canal de relacionamento com o
  investidor sobre ao crescimento populacional do município de Altamira e/ou
  alguma justificativa para tanto.
  </td>
<td style="width:139.2pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:30.5pt">
  http://norteenergiasa.com.br/site/
  </td>
</tr>
</tbody>
</table>
</alternatives>
<table-wrap-foot>
<fn-group>
<fn id="fn8" fn-type="other">
<p> Para a construção do relatório silencioso foram utilizadas informações divulgadas pela própria empresa Norte Energia S.A. em seus canais de informações e relação com o investidor (http://norteenergiasa.com.br/site/), bem como os relatórios divulgados pela entidade.</p>
<p> Vale ressaltar que a metodologia do presente estudo teve como base as metodologias aplicadas por Gibson et al. (2001), Hamling et al. (2006) e Moreira (2012).</p>
</fn>
</fn-group>
</table-wrap-foot>
</table-wrap>
</p>
<sec>
<title>
<bold>ANÁLISE DOS RESULTADOS</bold>
</title>
<p>
<italic>Usina Hidrelétrica de Belo Monte e a
Norte Energia S.A.</italic>
</p>
<p> A Usina Hidrelétrica de Belo Monte (UHE de Belo Monte) está em construção na Volta Grande do Rio Xingu, região amazônica que já se encontra em estágio avançado de ocupação. Isso acarreta, além dos impactos ambientais causados por um empreendimento desse tamanho e dessa natureza, impactos sociais desproporcionais (Leite et al., 2013).</p>
<p> Uma barragem será construída a quarenta quilômetros do município de Altamira. Estudos apontam que ela causará a inundação permanente do leito do rio, que atualmente só alaga por inteiro nos períodos de cheias. Por conta da barragem, a sequência do rio posterior a ela passará a ter sua vazão completamente reduzida, ficando com o fluxo definitivo que hoje ele tem somente nos períodos de secas, afetando diretamente as populações indígenas e ribeirinhas que vivem ao longo do rio e que dependem dele para sobreviver (Leite et al., 2013).</p>
<p> Quando houve o leilão em 20 de abril de 2010 para a concessão da construção da UHE de Belo Monte, coube à Norte Energia S.A. a outorga por um prazo de 35 anos. O Ibama concedeu a licença prévia de Belo Monte em 01/02/2010. Essa licença foi concedida a partir do cumprimento de um conjunto de condicionantes exigidos. Isso resultou em um Projeto Básico Ambiental (PBA), que prevê dezenas de programas, tais como: a construção de escolas e postos de saúde, instalação de redes de água e esgoto em Altamira e Vitória do Xingu; monitoramento da qualidade da água e das populações de peixes; detalhamento de um sistema de transposição de barcos no barramento de Pimental. Nunca foi feito um programa de mitigação tão ambicioso quanto esse na história da construção de barragens no Brasil. É previsto um gasto de mais de R$ 4 bilhões somente para tais programas de mitigações socioambientais (Leite et al., 2013).</p>
<sec>
<title>
<bold>Relatório
Sombra x Relatório Silencioso</bold>
</title>
<p>O relatório sombra que será
apresentado nesta pesquisa foi feito a partir de informações de terceiros. O
relatório silencioso foi elaborado com informações divulgadas pela própria
Norte Energia S.A. Em seguida, realiza-se uma comparação entre os dois
relatórios.</p>
<sec>
<title>
<italic>Tratamento das
Contingências Socioambientais</italic>
</title>
<p>O quadro 3 diz respeito à
construção do relatório sombra quanto aos processos judiciais levantados contra
a empresa Norte Energia S.A.</p>
<p>
<table-wrap id="gt3">
<label>Quadro 03</label>
<caption>
<title>Shadow Report das contingências socioambientais</title>
</caption>
<alt-text>Quadro 03 Shadow Report das contingências socioambientais</alt-text>
<alternatives>
<graphic xlink:href="471647049002_gt4.png" position="anchor" orientation="portrait"/>
<table style="width:531.6pt;margin-left:-42.8pt;border-collapse:collapse;" id="gt4-526564616c7963">
<tbody>
<tr style="height:13.8pt">
<td style="width:1.0cm;border:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  No
  </td>
<td style="width:361.5pt;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Shadow Report
  </td>
<td style="width:49.6pt;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Natureza
  </td>
<td style="width:92.15pt;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Referência
  </td>
<td style="height:13.8pt;border:none"/>
</tr>
<tr style="height:13.8pt">
<td style="height:13.8pt;border:none"/>
</tr>
<tr style="height:20.8pt">
<td style="width:1.0cm;border:solid windowtext 1.0pt;   border-top:none;padding:   0cm 3.5pt 0cm 3.5pt;height:20.8pt">
  1
  </td>
<td style="width:361.5pt;border-top:none;border-left:   none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:20.8pt">
  O Ministério
  Público Federal pediu à Justiça Federal que aplique imediatamente uma multa
  de R$ 500 mil por dia contra a Norte Energia S.A., que não cumpriu os acordos
  que assinou com indígenas em outubro de 2012 para garantir a desocupação dos
  canteiros de obras de Belo Monte. Na madrugada de 21/03 houve nova ocupação e
  a obra está mais uma vez parada por manifestação dos atingidos pela obra, inclusive
  os indígenas. 
  A manifestação
  da Norte Energia à Justiça Federal depois dessa determinação não nega que o
  acordo foi descumprido e elenca uma série de fatores externos como motivos
  para os atrasos. A empresa também diz que a multa não é razoável. Para o MPF,
  a multa é razoável e deve ser aplicada imediatamente, porque as obrigações já
  faziam parte da licença que a empresa recebeu do Ibama em junho de 2011 e
  houve liberação de mais de R$ 20 bilhões pelo BNDES para o empreendimento. 
  O processo tramita
  com o número 0001618-57.2011.4.01.3903.
  </td>
<td style="width:49.6pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:20.8pt">
  Social
  </td>
<td style="width:92.15pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:20.8pt">
  Ministério Público Federal (Procuradoria da República do Pará)
  http://www.prpa.mpf.mp.br/
  21/03/2013
  </td>
<td style="height:20.8pt;border:none"/>
</tr>
<tr style="height:41.6pt">
<td style="width:1.0cm;border:solid windowtext 1.0pt;   border-top:none;padding:   0cm 3.5pt 0cm 3.5pt;height:41.6pt">
  2
  </td>
<td style="width:361.5pt;border-top:none;border-left:   none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:41.6pt">
  O Ministério
  Público Federal (MPF) moveu hoje ação judicial contra a Norte Energia S.A.
  para obrigá-la a cumprir uma das condições de viabilidade de Belo Monte. A
  empresa se recusa a cumprir a obrigação de comprar terras para a comunidade
  indígena Juruna do Km 17. De acordo com a Licença Prévia (LP) concedida em
  2009 para a obra, sem a aquisição de terras a sobrevivência da comunidade, às
  margens de uma rodovia, ficaria ameaçada.
  De acordo com a
  Funai, o descumprimento dessa condicionante, “além de potencializar todos os
  impactos identificados nos estudos de impacto, favorece o surgimento de outros”.
  “Por se tratar de uma condicionante prevista há mais de quatro anos, que
  deveria ter sido finalizada há pelo menos dois anos, antes da LI (Licença de
  Instalação), o revés provocado pela empresa e não definição fundiária
  compromete todas as ações previstas para a comunidade Juruna da Aldeia Boa
  Vista”, registra o órgão indigenista. 
  Os impactos que
  estão se acumulando sobre a comunidade são graves. Muitos indígenas já estão
  se deslocando para os centros urbanos. “Esses indígenas vivem hoje na dependência
  absoluta do Município de Vitória do Xingu, através de vínculo de trabalho com
  escola que foi construída no local, em condições completamente alheias ao
  previsto no licenciamento”, diz o MPF na ação.
  A ação tramita
  na Vara Federal de Altamira com o no 1655-16.2013.4.01.3903.
  </td>
<td style="width:49.6pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:41.6pt">
  Social
  </td>
<td style="width:92.15pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:41.6pt">
  Ministério Público Federal (Procuradoria da República do Pará)
  http://www.prpa.mpf.mp.br/
  05/09/2013
  </td>
<td style="height:41.6pt;border:none"/>
</tr>
<tr style="height:20.8pt">
<td style="width:1.0cm;border:solid windowtext 1.0pt;   border-top:none;padding:   0cm 3.5pt 0cm 3.5pt;height:20.8pt">
  3
  </td>
<td style="width:361.5pt;border-top:none;border-left:   none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:20.8pt">
  A Norte Energia
  S.A. teve recurso negado na última semana contra decisão que determinou o
  pagamento de multa diária de R$ 500 mil por descumprimento de acordo firmado
  com indígenas e ribeirinhos em audiência de conciliação sobre a usina de Belo
  Monte. A decisão, do Tribunal Regional Federal da 1a Região
  (TRF-1), em Brasília, acata parecer do Ministério Público Federal (MPF).
  O parecer
  enviado à Corte pelo Ministério Público Federal foi contra o recurso e a
  favor das comunidades. “As obras realizadas, bem como o descumprimento das
  obrigações assumidas pela Norte Energia S.A., têm imenso impacto na vida, na
  cultura e na manutenção das inúmeras comunidades indígenas envolvidas e
  atingidas pelo empreendimento”, alerta a procuradora regional da República
  Eliana Torely.
  Ela defende que
  a multa fixada na decisão (R$ 500 mil) é proporcional e razoável, tendo em
  vista a elevada capacidade financeira do consórcio e o fato de que a conduta
  omissiva da Norte Energia vem causando danos irreparáveis às comunidades
  indígenas e ribeirinhas atingidas.
  Processo no:
  0008123-65.2013.4.01.0000
  </td>
<td style="width:49.6pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:20.8pt">
  Social
  </td>
<td style="width:92.15pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:20.8pt">
  Ministério Público Federal (Procuradoria da República do Pará)
  http://www.prpa.mpf.mp.br/
  02/12/2013
  </td>
<td style="height:20.8pt;border:none"/>
</tr>
</tbody>
</table>
</alternatives>
<attrib>elaboração própria</attrib>
<table-wrap-foot>
<fn-group>
<fn id="fn9" fn-type="other">
<p> Percebe-se, no ano de 2013, uma grande participação do Ministério Público Federal do Pará, representado pela Procuradoria da República do Pará, por conta do não cumprimento de diversas exigências feitas à Norte Energia S.A. para que a mesma obtivesse seus devidos licenciamentos. Não cabe ao objetivo dessa pesquisa investigar as motivações do MP/PA, mas confrontar tais informações com o que é divulgado pela entidade.</p>
<p> No quadro 4 foi construído o relatório silencioso, a fim de fazer um contraponto a essas informações do relatório sombra.</p>
</fn>
</fn-group>
</table-wrap-foot>
</table-wrap>
</p>
<p>
<table-wrap id="gt4">
<label>Quadro 04</label>
<caption>
<title> Silent Report das contingências socioambientais</title>
</caption>
<alt-text> 

Quadro 04  Silent Report das contingências socioambientais</alt-text>
<alternatives>
<graphic xlink:href="471647049002_gt5.png" position="anchor" orientation="portrait"/>
<table style="width:18.0cm;margin-left:-28.6pt;border-collapse:collapse;" id="gt5-526564616c7963">
<tbody>
<tr style="height:13.8pt">
<td style="width:21.25pt;border:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  No
  </td>
<td style="width:354.4pt;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Silent Report
  </td>
<td style="width:49.6pt;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Natureza
  </td>
<td style="width:3.0cm;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Referência
  </td>
<td style="height:13.8pt;border:none"/>
</tr>
<tr style="height:13.8pt">
<td style="height:13.8pt;border:none"/>
</tr>
<tr style="height:52.45pt">
<td style="width:21.25pt;border:solid windowtext 1.0pt;   border-top:none;padding:   0cm 3.5pt 0cm 3.5pt;height:52.45pt">
  1
  </td>
<td style="width:354.4pt;border-top:none;border-left:   none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:52.45pt">
  Um acordo
  firmado entre a Norte Energia S.A., empresa responsável pela construção e
  operação da Usina Hidrelétrica Belo Monte, e representantes de três aldeias
  indígenas da etnia Juruna resultou na liberação da estrada conhecida como
  Travessão 27, que dá acesso ao sítio Pimental, onde está sendo construída a
  casa de força auxiliar da hidrelétrica.
  O acordo definiu
  que a Norte Energia irá compensar as perdas sofridas pelos índios durante os
  meses de novembro e dezembro, quando a turbidez (cor) da água impediu a
  prática da captura de peixes artesanais nas aldeias Paquiçamba, Muratu e Furo
  Seco. A atividade é uma das principais fontes de renda desses povos.
  Um contrato
  firmado de próprio punho por assessores da Norte Energia foi assinado ainda
  no Travessão do Km 27 pelos seis líderes indígenas, além de Roberto Camilo
  Oliveira, diretor da Norte Energia; e Francisco Brasil, representante da
  Fundação Nacional do Índio (Funai). Logo após o acordo, por volta das 18h da
  quarta-feira (7), a estrada que dá acesso ao Sítio Pimental foi liberada
  pelos índios, que voltaram para suas aldeias em transporte cedido pelo Consórcio
  Construtor Belo Monte (CCBM).
  As compensações
  ambientais, sejam elas de qual natureza forem, estão previstas no Projeto
  Básico Ambiental do Componente Indígena (PBA-CI), documento que determina
  projetos e ações mitigadoras para a área de influência da construção da
  Usina. “Nesse caso (captura de peixes artesanais), nos deparamos com uma
  situação nova, mas que nem por isso deixou de ser resolvida com respeito e
  equilíbrio”, declarou o diretor Socioambiental da Norte Energia, Roberto
  Camilo Oliveira.
  </td>
<td style="width:49.6pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:52.45pt">
  Social
  </td>
<td style="width:3.0cm;border-top:none;border-left:none;border-bottom:   solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;padding:   0cm 3.5pt 0cm 3.5pt;height:52.45pt">
  Norte Energia S.A. 
  http://norteenergiasa.com.br/
  10/01/2013
  </td>
<td style="height:52.45pt;border:none"/>
</tr>
<tr style="height:110.2pt">
<td style="width:21.25pt;border:solid windowtext 1.0pt;   border-top:none;padding:   0cm 3.5pt 0cm 3.5pt;height:110.2pt">
  2
  </td>
<td style="width:354.4pt;border-top:none;border-left:   none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:110.2pt">
  A Norte Energia
  S.A. informa que, por volta das 19h40 da quinta-feira (09/05), 83 indígenas,
  sendo 77 da etnia Munduruku, da região de Itaituba, no Sudoeste do Pará,
  deixaram as instalações do Sítio Belo Monte em ônibus disponibilizados pela
  Empresa para levá-los de volta às suas terras na região do Tapajós, a 800 km
  de Altamira.
  A invasão dos
  indígenas da região do Tapajós durou uma semana, tendo sido iniciada na manhã
  de 02/05, quando os indígenas adentraram a portaria do sítio Belo Monte,
  chegando, inclusive, a confiscar veículos de trabalho da Empresa. Durante
  todo o período da ocupação, foram fornecidas refeições e assistência de saúde
  por parte da Empresa. Do total de 83 indígenas, 6 eram ribeirinhos e 40 eram
  mulheres e crianças.
  A saída ocorreu
  por decisão judicial de reintegração de posse do Tribunal Regional Federal da
  1a Região (TRF 1).
  </td>
<td style="width:49.6pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:110.2pt">
  Social
  </td>
<td style="width:3.0cm;border-top:none;border-left:none;border-bottom:   solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;padding:   0cm 3.5pt 0cm 3.5pt;height:110.2pt">
  Norte Energia S.A. 
  http://norteenergiasa.com.br/
  10/05/2013
  </td>
<td style="height:110.2pt;border:none"/>
</tr>
<tr style="height:107.45pt">
<td style="width:21.25pt;border:solid windowtext 1.0pt;   border-top:none;padding:   0cm 3.5pt 0cm 3.5pt;height:107.45pt">
  3
  </td>
<td style="width:354.4pt;border-top:none;border-left:   none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:107.45pt">
  A Norte Energia
  S.A. informa que retomou as obras no Sitio Belo Monte nesta sexta-feira
  (31/05), após acordo na negociação entre os representantes do Governo Federal
  com os indígenas que invadiram o canteiro do sítio Belo Monte. A negociação
  possibilitou a retomada das obras no local.
  Os invasores
  continuarão alojados no escritório central, longe de qualquer área de
  produção pesada e, na próxima terça-feira (04/06), pela manhã, serão
  transportados a Brasília pela União, para reunião com o Governo Federal. O
  acordo garante a segurança dos trabalhadores e dos próprios invasores.
  Desde o início
  da manhã de hoje os operários estão retomando seus postos de trabalho, já que
  estão sendo divulgados avisos nas rádios e TVs locais para informar o
  reinício das obras.
  A Norte Energia
  informa que não participou na negociação, uma vez que o pleito dos invasores
  não é da alçada da empresa e a invasão já foi reconhecida pelo Poder
  Judiciário como ilegal.
  </td>
<td style="width:49.6pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:107.45pt">
  Social
  </td>
<td style="width:3.0cm;border-top:none;border-left:none;border-bottom:   solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;padding:   0cm 3.5pt 0cm 3.5pt;height:107.45pt">
  Norte Energia S.A. 
  http://norteenergiasa.com.br/
  03/06/2013
  </td>
<td style="height:107.45pt;border:none"/>
</tr>
<tr style="height:43.65pt">
<td style="width:21.25pt;border:solid windowtext 1.0pt;   border-top:none;padding:   0cm 3.5pt 0cm 3.5pt;height:43.65pt">
  4
  </td>
<td style="width:354.4pt;border-top:none;border-left:   none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:43.65pt">
  12. Provisões
  A Companhia
  reconheceu um passivo contingente durante o exercício de 2013 no valor de R$
  6.692, referente à aquisição e indenizações de benfeitorias de terrenos
  litigiosos na região atingida pela construção da usina. Tal provisão teve
  como contrapartida o grupo de contas de imobilizado.
  </td>
<td style="width:49.6pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:43.65pt">
  Social
  </td>
<td style="width:3.0cm;border-top:none;border-left:none;border-bottom:   solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;padding:   0cm 3.5pt 0cm 3.5pt;height:43.65pt">
  Norte Energia S.A.               (Demonstração Financeira)
  http://norteenergiasa.com.br/
  31/12/2013
  </td>
<td style="height:43.65pt;border:none"/>
</tr>
<tr style="height:43.65pt">
<td style="width:21.25pt;border:solid windowtext 1.0pt;   border-top:none;padding:   0cm 3.5pt 0cm 3.5pt;height:43.65pt">
  5
  </td>
<td style="width:354.4pt;border-top:none;border-left:   none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:43.65pt">
  24. Demandas
  judiciais e administrativas
  Em 15 de
  fevereiro de 2012, em 24 de setembro e 1o de outubro de
  2013, a Companhia foi autuada pelo Instituto Brasileiro de Meio Ambiente e
  dos Recursos Renováveis (“IBAMA”) em relação a possíveis descumprimentos de
  condicionantes da Licença Ambiental de Instalação (“LI”) da UHE. De acordo
  com as autuações, os processos estão avaliados em R$7.000, R$3.000 e R$2.700
  respectivamente. O assunto não implica qualquer suspensão da referida
  licença, que continua válida, e, por isso, as obras e demais atividades do
  empreendimento seguem seu curso normal. Vale ressaltar que o próprio IBAMA,
  nos documentos que embasam a autuação, destacou que as desconformidades
  apontadas não implicam “reflexos ambientais negativos”.
   Em 31 de dezembro de 2013, a Companhia
  possuía ação intentada pela Defensoria Pública do Estado do Pará, que
  pleiteia indenização por perdas e danos decorrentes do suposto atraso nas
  obras de reforma, ampliação e construção de escolas. O valor proposto na ação
  é de R$ 100.000. Após tratativas com a Defensoria Pública, foi protocolizada
  petição na ação com proposta de acordo a ser celebrado. O eventual valor do
  acordo será em base menor ao proposto na ação. Com base em análises
  preparadas pela Administração e seus assessores jurídicos, o processo
  mencionado tem prognóstico de perda remota. Existem ações, de menor
  representatividade, nas quais a Companhia é parte envolvida, que com base em
  análises preparadas pela Administração e seus assessores jurídicos possuem
  prognóstico de perda possível:
  a) Ação movida
  pelo Ministério Público Federal do Pará no qual solicita a suspensão da
  Licença de Instalação por alegar o suposto não cumprimento das condicionantes
  da Licença Prévia no 342/2010, valor estimado da perda é de
  R$ 500.
   b) Ações referentes a indenizações pela
  desocupação e avaliações de benfeitorias nas propriedades desapropriadas no
  valor de R$ 3.944.
  c) Ação do
  Ministério Público Federal que alega o descumprimento das condicionantes da
  licença ambiental, consistente na criação de uma reserva indígena para a
  comunidade Juruna no Km 17. Valor estimado da perda é de R$ 100.
  d) Ação cautelar
  com pedido de liminar pela Associação de Criadores e Exportadores de Peixes
  Ornamentais de Altamira para ser mantida a pesca ornamental, suspendendo a
  construção da usina até que seja realizado laudo pericial. Valor estimado da
  causa R$ 1.
  e) Ações
  trabalhistas no valor estimado de R$ 90.
  </td>
<td style="width:49.6pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:43.65pt">
  Social
  </td>
<td style="width:3.0cm;border-top:none;border-left:none;border-bottom:   solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;padding:   0cm 3.5pt 0cm 3.5pt;height:43.65pt">
  Norte Energia S.A.               (Demonstração Financeira)
  http://norteenergiasa.com.br/
  31/12/2013
  </td>
<td style="height:43.65pt;border:none"/>
</tr>
</tbody>
</table>
</alternatives>
<attrib>elaboração própria</attrib>
</table-wrap>
</p>
<p> Os itens de número 1, 2 e 3 do relatório silencioso exposto no quadro 3 são notas divulgadas pela empresa Norte Energia S.A. no seu canal de comunicação no próprio site da entidade. Nelas não há como perceber alguma relação direta com os processos do MP/PA descritos no relatório sombra exposto no quadro 4. </p>
<p> Os itens de número 4 e 5 são as Notas Explicativas de número 12 e 24 das Demonstrações Financeiras da empresa Norte Energia S.A. referentes ao exercício social de 31 de dezembro de 2013. Na nota explicativa de número 12 a empresa reconhece um Passivo com Contingência de R$ 6.692 (mil) no seu Balanço Patrimonial referente à aquisição e indenizações de benfeitorias de terrenos litigiosos na região atingida pela construção da usina, valor esse explícito no Balanço Patrimonial da empresa de mesma data. Já na nota explicativa de número 24 a empresa evidencia e reconhece outras demandas administrativas e judiciais. Nas referentes ações discriminadas na nota explicativa de número 24, pode-se fazer uma relação direta dos processos descritos nas letras a) e c) com os citados no relatório sombra.</p>
<p> De acordo com o Comitê de Pronunciamentos Contábeis (CPC), Pronunciamento Técnico 25 – Provisões, Passivos Contingentes e Ativos Contingentes, quando se diz respeito a passivo contingente, somente os eventos possíveis de acontecer são explícitos em nota explicativa, e os prováveis de acontecer são reconhecidos no Balanço Patrimonial e em nota explicativa. Por esse motivo pode-se chegar à conclusão do não reconhecimento no Balanço Patrimonial das contingências geradas pelos processos descritos na nota explicativa de número 24 e relacionados com o relatório sombra, pois tiveram prognóstico de perda possível e não provável. Mas estão explicados em nota explicativa.</p>
<p> No Brasil, a evidenciação socioambiental não é compulsória, logo o disclosure é considerado voluntário (Rover et al., 2012). Porém, o CPC 25 exige a evidenciação de passivos e ativos contingentes, mesmo ele sendo de caráter socioambiental. Pode-se utilizar esse exemplo para justificar a defesa da divulgação obrigatória tida por Maltby (1997) e Levy et al. (2010). Mesmo com suas limitações, a obrigatoriedade da divulgação de passivos contingentes de caráter socioambiental permite que a lacuna da informação entre stakeholder e entidade seja menor. Consegue-se associar alguns itens do relatório sombra com o relatório silencioso.</p>
<p> Com exceção dessas três notícias e as Notas Explicativas de número 12 e 24 das Demonstrações Financeiras da empresa, não há nenhum outro tipo de informação que diz respeito a essa natureza divulgada pela Norte Energia S.A.</p>
<sec>
<title>Mitigação dos
impactos ambientais: o impacto na ictiofauna (peixes) da Volta Grande do Xingu</title>
<p> A população ribeirinha da Volta Grande do Xingu tem na pesca sua principal fonte de renda, e para obter uma renda extra mensal há o comércio de peixes ornamentais. Com a diminuição da vazão do rio, os peixes que dependem das cheias para sua sobrevivência serão atingidos, o que afetará diretamente o estilo de vida das pessoas que dependem do rio para sua sobrevivência.</p>
<p> O processo de licenciamento pelo Ibama resultou num Projeto Básico Ambiental (PBA), que prevê projetos voltados para a mitigação dos impactos ambientais dessa amplitude ocasionados pela construção da UHE de Belo Monte. Pelos estudos de impacto ambiental, cerca de 50% das espécies de peixes da região irão sofrer alterações na sua densidade e abundância por conta desse empreendimento.</p>
<p> No quadro 05 foi construído o relatório sombra, com os impactos na ictiofauna na região da Volta Grande do Xingu.</p>
<p>
<table-wrap id="gt5">
<label>Quadro 05</label>
<caption>
<title>Shadow Report das mitigações dos impactos ocasionados na ictiofauna</title>
</caption>
<alt-text>Quadro 05 Shadow Report das mitigações dos impactos ocasionados na ictiofauna</alt-text>
<alternatives>
<graphic xlink:href="471647049002_gt6.png" position="anchor" orientation="portrait"/>
<table style="width:503.0pt;margin-left:-49.9pt;border-collapse:collapse;" id="gt6-526564616c7963">
<tbody>
<tr style="height:13.8pt">
<td style="width:42.55pt;border:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  No
  </td>
<td style="width:326.05pt;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Shadow Report
  </td>
<td style="width:49.6pt;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Natureza
  </td>
<td style="width:84.8pt;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Referência
  </td>
<td style="height:13.8pt;border:none"/>
</tr>
<tr style="height:13.8pt">
<td style="height:13.8pt;border:none"/>
</tr>
<tr style="height:20.8pt">
<td style="width:42.55pt;border:solid windowtext 1.0pt;   border-top:none;padding:   0cm 3.5pt 0cm 3.5pt;height:20.8pt">
  1
  </td>
<td style="width:326.05pt;border-top:none;border-left:   none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:20.8pt">
  A passagem do
  Sítio Pimental vai achatar a amplitude notável dos pulsos de enchente e seca
  do Xingu, cuja vazão pode ultrapassar 20.000 m³/s entre dezembro e maio e
  despencar para 400 m³/s por volta de agosto/setembro, nos piores anos.
  Várias das
  espécies de peixes dependem das cheias para se alimentar e se reproduzir,
  invadindo a floresta inundada (igapós) para comer frutas e desovar em
  ambientes protegidos. Quando as turbinas da casa de força principal em Belo
  Monte estiverem funcionando, a partir de 2016, o vertedouro de Pimental garantirá
  uma vazão mínima na Volta Grande de 700 m³/s na seca, mas as cheias se
  limitarão a 4.000 m³/s e 8.000 m³/s, em anos alternados, a chamada “vazão
  sanitária”.
  </td>
<td style="width:49.6pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:20.8pt">
  Ambiental
  </td>
<td style="width:84.8pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:20.8pt">
  Folha de S. Paulo
  http://www.folha.uol.com.br/
  16/12/2013
  </td>
<td style="height:20.8pt;border:none"/>
</tr>
<tr style="height:56.2pt">
<td style="width:42.55pt;border:solid windowtext 1.0pt;   border-top:none;padding:   0cm 3.5pt 0cm 3.5pt;height:56.2pt">
  2
  </td>
<td style="width:326.05pt;border-top:none;border-left:   none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:56.2pt">
  O responsável
  pela gestão ambiental da Norte Energia é o engenheiro Antônio Neto. Ele diz
  não ter ideia do que vai acontecer com a queda da vazão média na enchente
  para os picos de 4.000 m³/s e 8.000 m³/s em anos alternados, nem com as
  espécies que dependem do pulso de cheia: “Se alguém diz que sabe o que vai
  acontecer, está mentindo”. Em outras palavras, Belo Monte é um grande
  experimento com a fauna e a flora da Volta Grande.
  </td>
<td style="width:49.6pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:56.2pt">
  Ambiental
  </td>
<td style="width:84.8pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:56.2pt">
  Folha de S. Paulo
  http://www.folha.uol.com.br/
  16/12/2013
  </td>
<td style="height:56.2pt;border:none"/>
</tr>
<tr style="height:73.95pt">
<td style="width:42.55pt;border:solid windowtext 1.0pt;   border-top:none;padding:   0cm 3.5pt 0cm 3.5pt;height:73.95pt">
  3
  </td>
<td style="width:326.05pt;border-top:none;border-left:   none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:73.95pt">
  A Norte Energia
  realizou em Brasília, no final de outubro, uma rodada de discussões sobre o
  Sistema de Transposição de Peixes – STP da UHE Belo Monte. O evento contou
  com a participação de dez instituições convidadas, inclusive o Ibama
  (Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renováveis),
  que expuseram suas experiências e conhecimentos sobre sistemas similares. O
  STP está sendo construído próximo à barragem do sítio Pimental, onde ficará a
  Casa de Força Complementar da Usina Hidrelétrica Belo Monte, em atendimento
  às condicionantes do Projeto Básico Ambiental. 
  O sistema tem
  como objetivo permitir a passagem de peixes da região de jusante (abaixo) da barragem
  para montante (acima). O Sistema de Transposição de Peixes que será
  implementado na UHE Belo Monte vem sendo discutido desde 2007, quando foi
  criado um grupo de trabalho para elaborar o projeto do STP da hidrelétrica. 
  Os estudos levam
  em consideração as características da região, que tem na pesca artesanal e
  esportiva um dos maiores eventos populares e de incremento na cadeia
  alimentar. Os resultados até agora obtidos nos monitoramentos do PBA,
  especialmente a ictiofauna local (peixes), fornecerão informações
  imprescindíveis para a operação do Sistema de Transposição de Peixes. De acordo
  com a consultora ambiental do projeto, Valéria Saracura, “essas informações
  vão orientar a elaboração do Plano de Ação para o STP da Usina Hidrelétrica
  Belo Monte, em fase atual de discussão com os especialistas e colaboradores
  da Norte Energia”.
  </td>
<td style="width:49.6pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:73.95pt">
  Ambiental
  </td>
<td style="width:84.8pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:73.95pt">
  Blog da Hidrelétrica de Belo Monte
  http://blogbelomonte.com.br/
  6/11/2013
  </td>
<td style="height:73.95pt;border:none"/>
</tr>
</tbody>
</table>
</alternatives>
<attrib> elaboração própria</attrib>
<table-wrap-foot>
<fn-group>
<fn id="fn11" fn-type="other">
<p> O item 1 do quadro 04 expressa a preocupação e a emergência quanto ao impacto que a UHE de Belo Monte ocasionará na ictiofauna da Volta Grande do Xingu e, consequentemente, no estilo de vida da população ribeirinha da região.</p>
<p> Em entrevista para a Folha de S. Paulo, exposta no item de número 2 do relatório sombra apresentado no quadro 04, o responsável pela gestão ambiental da Norte Energia, Antônio Neto, admite que não se pode saber o que realmente irá acontecer com a queda da vazão média nas cheias do rio, pelo fato de a maioria dos projetos nesse sentido serem de caráter experimental. </p>
<p> Já o item 3 do relatório sombra evidencia os avanços na discussão dos projetos de mitigação dos impactos ambientais da construção da UHE de Belo Monte, nesse caso, o sistema de transposição de peixes. Porém deixa mais claro esse caráter experimental. </p>
<p> O quadro 06 traz as informações divulgadas pela Norte Energia S.A. quanto às mitigações dos impactos ocasionados na ictiofauna por conta da construção da UHE de Belo Monte.</p>
</fn>
</fn-group>
</table-wrap-foot>
</table-wrap>
</p>
<p>
<table-wrap id="gt6">
<label>Quadro 06</label>
<caption>
<title>Silent Report das mitigações dos impactos ocasionados na ictiofauna</title>
</caption>
<alt-text>Quadro 06  Silent Report das mitigações dos impactos ocasionados na ictiofauna</alt-text>
<alternatives>
<graphic xlink:href="471647049002_gt7.png" position="anchor" orientation="portrait"/>
<table style="width:503.25pt;margin-left:-49.9pt;border-collapse:collapse;" id="gt7-526564616c7963">
<tbody>
<tr style="height:13.8pt">
<td style="width:42.55pt;border:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  No
  </td>
<td style="width:326.05pt;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Silent Report
  </td>
<td style="width:49.6pt;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Natureza
  </td>
<td style="width:3.0cm;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Referência
  </td>
<td style="height:13.8pt;border:none"/>
</tr>
<tr style="height:13.8pt">
<td style="height:13.8pt;border:none"/>
</tr>
<tr style="height:34.95pt">
<td style="width:42.55pt;border:solid windowtext 1.0pt;   border-top:none;padding:   0cm 3.5pt 0cm 3.5pt;height:34.95pt">
  1
  </td>
<td style="width:326.05pt;border-top:none;border-left:   none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:34.95pt">
  Uma iniciativa
  importante é direcionada à conservação da ictiofauna e ao estudo sobre a
  pesca na Volta Grande do Xingu. O projeto incentivado pela Norte Energia
  resultará na construção de dois laboratórios no campus da Universidade
  Federal do Pará (UFPA), em Altamira, um deles já em andamento, com previsão
  de conclusão no final do primeiro semestre de 2014. 
  À parte da
  implantação desses dois laboratórios, foram iniciados em 2013 e encontram-se
  em curso, patrocinados pela Norte Energia, experimentos voltados a espécies
  de peixes ornamentais nos Laboratórios de Reprodução e Cultivo de Espécies
  Ornamentais (IFPA, campus Castanhal) e do Centro de Estudos Ambientais (CEA –
  NE). 
  Em fevereiro de
  2013, a Companhia iniciou o Projeto de Biotelemetria de Peixes, que tem por
  objetivo estudar as rotas migratórias de peixes comercialmente importantes,
  de modo a mitigar os efeitos da construção do barramento da Usina sobre a
  movimentação e reprodução dessas espécies. Até outubro de 2013, 196 peixes
  foram marcados e estão sendo rastreados pelos pesquisadores, ressaltando-se
  que, desses indivíduos marcados, um total de 132 foi registrado pelo menos
  uma vez após a soltura.
  </td>
<td style="width:49.6pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:34.95pt">
  Ambiental
  </td>
<td style="width:3.0cm;border-top:none;border-left:none;border-bottom:   solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;padding:   0cm 3.5pt 0cm 3.5pt;height:34.95pt">
  Norte Energia S.A. 
  (Relatório Anual de Administração 2013) http://norteenergiasa.com.br/
  31/12/2013
  </td>
<td style="height:34.95pt;border:none"/>
</tr>
<tr style="height:97.7pt">
<td style="width:42.55pt;border:solid windowtext 1.0pt;   border-top:none;padding:   0cm 3.5pt 0cm 3.5pt;height:97.7pt">
  2
  </td>
<td style="width:326.05pt;border-top:none;border-left:   none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:97.7pt">
  Os pescadores de
  Altamira, Vitória do Xingu, Senador José Porfírio, Porto de Moz e Gurupá
  contarão com uma estrutura adequada para o embarque e desembarque e
  armazenamento do pescado acompanhado de uma fábrica de gelo. Já em Altamira,
  será construído o Centro de Integração de Pesca Artesanal (Cipar), ao lado do
  futuro Mercado de Peixe, ambos parte de um projeto mais amplo que tem como
  principal meta a revitalização de toda a orla da cidade.
  Junto com os
  pontos de embarque e desembarque, estas cidades também receberão um salão
  comunitário com capacidade para 80 pessoas que será utilizado como sede dos
  profissionais que integram a colônia de pescadores, em cada município. Entre
  os dias 09 e 30 de setembro de 2013, técnicos e especialistas da Norte
  Energia, empresa responsável pela instalação e operação da Usina Hidrelétrica
  Belo Monte, visitarão as cidades de Vitória do Xingu, Senador José Porfírio,
  Porto de Moz e Gurupá para analisar a dimensão e amplitude de cada construção
  a partir da produção do pescado e quantidade de trabalhadores que vivem dessa
  atividade, em cada município.
  </td>
<td style="width:49.6pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:97.7pt">
  Social
  </td>
<td style="width:3.0cm;border-top:none;border-left:none;border-bottom:   solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;padding:   0cm 3.5pt 0cm 3.5pt;height:97.7pt">
  Norte Energia S.A. 
  http://norteenergiasa.com.br/
  7/8/2013
  </td>
<td style="height:97.7pt;border:none"/>
</tr>
</tbody>
</table>
</alternatives>
<attrib>elaboração própria</attrib>
</table-wrap>
</p>
<p> O item número 1 do relatório silencioso exposto no quadro 05 foi retirado do trecho do Relatório Anual de Administração de 2013 divulgado pela Norte Energia S.A. e mostra o desenvolvimento dos projetos previstos pelo PBA. Pode-se concluir esse caráter experimental comentado no relatório sombra. Percebe-se também o alto grau de dependência da população ribeirinha em relação a esses projetos, já que a criação e reprodução de peixes ornamentais irão ficar a critérios dos laboratórios, tanto quanto o projeto que prevê a pesca sustentável da região. A população ribeirinha perde a autonomia de sua sustentabilidade. </p>
<p> As obras da UHE de Belo Monte já estão em andamento desde 2011 e os projetos de mitigação dos impactos ambientais na ictiofauna da região estão ainda em fase de construção e estudos, o que vem gerando grandes embates com a população local, ribeirinha e indígena que já sentem o impacto no seu estilo de vida e sustento com os andamentos da construção da UHE de Belo Monte. Não foram encontrados outros tipos de informações nesse âmbito nos meios de comunicação da Norte Energia S.A., bem como em seus relatórios administrativos e financeiros.</p>
<p> Diferentemente da empresa analisada por Hamling et al. (2006), a Norte Energia S.A. deixa clara sua suposta preocupação quanto ao meio ambiente e a sociedade que a cerca, mas, ao analisar as informações do shadow e do silent reports quanto ao impacto da ictiofauna da região, percebe-se uma divergência de interesses entre stakeholder e empresa.</p>
<sec>
<title>Crescimento Populacional do município de Altamira</title>
<p>A construção da UHE de Belo Monte
tem em sua área de influência 11 municípios, mas nenhum está sendo mais afetado
que Altamira e um dos maiores impactos sociais é o efeito de migração
ocasionado pela construção da usina. O quadro 7 representa o relatório sombra
quanto ao crescimento populacional de Altamira.</p>
<p>
<table-wrap id="gt7">
<label>Quadro 07</label>
<caption>
<title>Shadow Report do crescimento populacional do município de Altamira</title>
</caption>
<alt-text>Quadro 07 Shadow Report do crescimento populacional do município de Altamira</alt-text>
<alternatives>
<graphic xlink:href="471647049002_gt8.png" position="anchor" orientation="portrait"/>
<table style="width:524.55pt;margin-left:-49.9pt;border-collapse:collapse;" id="gt8-526564616c7963">
<tbody>
<tr style="height:13.8pt">
<td style="width:21.3pt;border:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  No
  </td>
<td style="width:13.0cm;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Shadow Report
  </td>
<td style="width:49.65pt;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Natureza
  </td>
<td style="width:3.0cm;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Referência
  </td>
<td style="height:13.8pt;border:none"/>
</tr>
<tr style="height:13.8pt">
<td style="height:13.8pt;border:none"/>
</tr>
<tr style="height:26.85pt">
<td style="width:21.3pt;border:solid windowtext 1.0pt;   border-top:none;padding:   0cm 3.5pt 0cm 3.5pt;height:26.85pt">
  1
  </td>
<td style="width:13.0cm;border-top:none;border-left:   none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:26.85pt">
  A população da
  cidade, que era de quase 100 mil pessoas no Censo de 2010, saltou para pelo
  menos 140 mil. O número total de operários previstos para o pico da obra era
  de 18 mil, porém chegou a 25 mil neste segundo semestre.
  </td>
<td style="width:49.65pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:26.85pt">
  Social
  </td>
<td style="width:3.0cm;border-top:none;border-left:none;border-bottom:   solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;padding:   0cm 3.5pt 0cm 3.5pt;height:26.85pt">
  Folha de S. Paulo
  http://www.folha.uol.com.br/
  16/12/2013
  </td>
<td style="height:26.85pt;border:none"/>
</tr>
<tr style="height:30.15pt">
<td style="width:21.3pt;border:solid windowtext 1.0pt;   border-top:none;padding:   0cm 3.5pt 0cm 3.5pt;height:30.15pt">
  2
  </td>
<td style="width:13.0cm;border-top:none;border-left:   none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:30.15pt">
  Altamira passa
  agora por uma nova fase. A recente migração de interessados em busca de
  emprego e de empreendedores que planejam investimentos decorrentes da
  construção da usina tem feito a população crescer substancialmente. Segundo o
  Instituto Brasileiro de Geografia e Estatística (IBGE) o município tem 99 mil
  habitantes, mas os dados da prefeitura indicam cerca de 140 mil moradores. O
  prefeito Domingos Juvenil Nunes de Sousa (PMDB) acredita que esse número se
  deve à hidrelétrica. A oferta de emprego traz gente de todo o Brasil em busca
  de trabalho. Esse aumento populacional, por outro lado, trouxe sérios
  problemas ao município, que conta com pouca infraestrutura nas áreas de
  saúde, educação e saneamento básico.
  A cidade não tem
  sistema de esgoto e menos de 40% da população possui acesso ao abastecimento
  de água. Segundo o prefeito, esta água também não é de qualidade. “Agora que
  está sendo feita uma revitalização da rede, para que chegue água potável à
  população”, afirma. Entre as condicionantes impostas pelo Plano Básico
  Ambiental (PBA) da UHE Belo Monte, de responsabilidade da empresa Norte
  Energia, está a construção de 100% do sistema de esgoto e abastecimento de
  água no município. 
  </td>
<td style="width:49.65pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:30.15pt">
  Social
  </td>
<td style="width:3.0cm;border-top:none;border-left:none;border-bottom:   solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;padding:   0cm 3.5pt 0cm 3.5pt;height:30.15pt">
  Prefeitura de Altamira
  http://altamira.pa.gov.br/
  29/08/2013
  </td>
<td style="height:30.15pt;border:none"/>
</tr>
</tbody>
</table>
</alternatives>
<attrib> elaboração própria</attrib>
<table-wrap-foot>
<fn-group>
<fn id="fn13" fn-type="other">
<p> De acordo com pesquisa do Data Folha, exposto na reportagem do item número 1 do relatório sombra presente no quadro 7, a população de Altamira cresceu quase 40% em apenas quatro anos. Pode-se dizer que esse crescimento populacional desenfreado é o que mais gera impactos sociais quanto ao empreendimento da Norte Energia S.A.</p>
<p> Essa informação é corroborada pelo que é divulgado pela prefeitura de Altamira no item 2 do relatório sombra exposto no quadro 7. O último censo feito pelo IBGE foi realizado em 2010, um ano antes de as obras da UHE de Belo Monte começarem. Ainda de acordo com o item 2 do quadro acima, esse crescimento desenfreado da população do município de Altamira trouxe sérios problemas por conta da falta de infraestrutura da cidade, onde não existe sistema de esgoto e apenas 40% da população é contemplada com abastecimento de água. </p>
<p> Não foi encontrada nenhuma divulgação por parte da Norte Energia S.A. em relação ao crescimento demográfico de Altamira entre os dias 01/01/2013 e 31/12/2013. Porém, em 03/09/2014 a empresa divulgou a seguinte informação disposta no relatório silencioso do quadro 08.</p>
</fn>
</fn-group>
</table-wrap-foot>
</table-wrap>
</p>
<p>
<table-wrap id="gt8">
<caption>
<title>
<bold>Quadro 08</bold>
</title>
<p>Silent Report do crescimento populacional do município de Altamira</p>
</caption>
<alternatives>
<graphic xlink:href="471647049002_gt9.png" position="anchor" orientation="portrait"/>
<table style="width:453.1pt;border-collapse:collapse;  " id="gt9-526564616c7963">
<tbody>
<tr style="height:13.8pt">
<td style="width:15.3pt;border:solid windowtext 1.0pt;   padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  No
  </td>
<td style="width:301.55pt;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Silent Report
  </td>
<td style="width:51.45pt;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Natureza
  </td>
<td style="width:84.8pt;border:solid windowtext 1.0pt;   border-left:none;padding:0cm 3.5pt 0cm 3.5pt;height:13.8pt" rowspan="2">
  Referência
  </td>
<td style="height:13.8pt;border:none"/>
</tr>
<tr style="height:13.8pt">
<td style="height:13.8pt;border:none"/>
</tr>
<tr style="height:95.1pt">
<td style="width:15.3pt;border:solid windowtext 1.0pt;   border-top:none;padding:   0cm 3.5pt 0cm 3.5pt;height:95.1pt">
  1
  </td>
<td style="width:301.55pt;border-top:none;border-left:   none;border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:95.1pt">
  O Instituto
  Brasileiro de Geografia e Estatística (IBGE) divulgou as projeções de
  crescimento populacional dos mais de cinco mil municípios brasileiros em
  2014. Em Altamira, principal cidade da área de influência da Usina
  Hidrelétrica Belo Monte, a população cresceu exatos 7.693 em 2014 quando
  comparada aos números de 2010.
  O Censo de 2010
  do IBGE contabilizou 99.075 moradores no município. Na estimativa de
  crescimento de 2014, o Instituto informou o número de 106.768 moradores. O
  principal centro urbano da região da UHE Belo Monte está fora da lista de cidades
  paraenses com maior crescimento populacional, como Anapu, Parauapebas,
  Tailândia e Ipixuna do Pará.
  A Norte Energia,
  responsável pela construção da Hidrelétrica, contribui com o desenvolvimento
  da região por meio da implantação de equipamentos públicos como escolas,
  hospitais, postos de saúde, sistemas de coleta e tratamento de esgoto, redes
  de água tratada, aterros sanitários, entre outros.
  </td>
<td style="width:51.45pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:95.1pt">
  Social
  </td>
<td style="width:84.8pt;border-top:none;border-left:none;   border-bottom:solid windowtext 1.0pt;border-right:solid windowtext 1.0pt;      padding:0cm 3.5pt 0cm 3.5pt;height:95.1pt">
  Norte Energia S.A. 
  http://norteenergiasa.com.br/
  03/09/2014
  </td>
<td style="height:95.1pt;border:none"/>
</tr>
</tbody>
</table>
</alternatives>
<attrib>elaboração própria</attrib>
</table-wrap>
</p>
<p> A informação do item 1 do relatório silencioso exposto no quadro 07 não condiz com as informações divulgadas no relatório sombra do quadro 06. Baseando-se em uma projeção de crescimento populacional divulgado pelo IBGE, a Norte Energia S.A. afirma que a população de Altamira cresceu 7.693 de 2010 para 2014.</p>
<p> O documento emitido pelo Instituto Brasileiro de Geografia e Estatística (IBGE) que explica a metodologia adotada para se fazer a projeção anual dos municípios do Brasil diz o seguinte:</p>
<p> As estimativas da população residente para os municípios brasileiros, com data de referência em 1o de julho de 2014, foram elaboradas a partir da projeção para cada estado, incorporando os resultados dos parâmetros demográficos calculados com base nos resultados do Censo Demográfico 2010 e nas informações mais recentes dos registros de nascimentos e óbitos. Os totais populacionais dos municípios, enumerados pelos Censos Demográficos 2000 e 2010, foram ajustados linearmente, utilizando-se o fator de ajuste aplicado nestes anos em cada Unidade da Federação. Esses totais populacionais municipais, em 2000 e 2010, serviram de base para o estabelecimento da tendência de crescimento de cada município no cálculo das estimativas municipais, com data de referência em 1o de julho de 2014 (IBGE, 2014 p. 4).</p>
<p> O que se pode entender pelo documento emitido pelo IBGE, que o cálculo da projeção de crescimento demográfico dos municípios do Brasil se utiliza um fator de ajuste, fator esse calculado levando em consideração o comportamento do crescimento populacional entre um censo e outro, no caso para 2014, esse fator foi calculado utilizando como base o crescimento populacional entre o censo de 2000 e 2010.</p>
<p> Pode-se concluir que, talvez, a construção da UHE de Belo Monte e a migração de pessoas para suas áreas de influência, principalmente para a cidade de Altamira, não foi incluída no cálculo da estimativa de crescimento populacional desse município, o que gera essa discrepância entre o relatório sombra e o relatório silencioso.</p>
<p> Vale ressaltar que se tentou entrar em contato com pessoas dentro do IBGE responsáveis por esse cálculo e até o fim deste trabalho não se obteve resposta.</p>
<p> Tal resultado evidencia a lacuna que existe entre a percepção da realidade pelos stakeholders e a Norte Energia S.A. É clara a seleção de informação favorável por parte da Norte Energia S.A. no que diz respeito ao crescimento populacional do município de Altamira. O relatório sombra e silencioso apresentado nesta seção deixa evidente a crítica tida pela literatura quanto à seleção de informações ambientais positivas e omissão de informações negativas da performance ambiental no que diz respeito à evidenciação voluntária (Collison et al., 2010; Moreira, 2012; Pereira, Luz &amp; Carvalho, 2015). </p>
<p> O relatório sombra e o relatório silencioso que trata do crescimento populacional do município de Altamira cumprem com seu objetivo de dar voz a outros atores e quebrar a hegemonia do relatório socioambiental corporativo que configuram a realidade atual, como acusam Bebbington et al. (2007) e Dai (2010).</p>
<sec>
<title>
<bold>CONCLUSÃO</bold>
</title>
<p> Atendendo à demanda cada vez maior de informações socioambientais mais precisas por parte dos stakeholders, pesquisadores em Ciências Contábeis, por meio dos esforços de seus pesquisadores e entidades interessadas, estão desenvolvendo ferramentas e métodos para atender a essa demanda.</p>
<p>  O shadow e silent reports foram intuídos para ajudar e aperfeiçoar a divulgação da informação socioambiental por parte das entidades. O primeiro utiliza informações de terceiros e o segundo, informações da entidade objeto em questão, com o intuito de diminuir o gap de informações entre a organização e a sociedade que a cerca. Além de auxiliar no combate do discurso hegemônico dos relatórios socioambientais corporativos tipos na configuração atual (Bebbington et al., 2007; Dai, 2010).</p>
<p> Levando em consideração essa demanda por parte dos stakeholders e impactos socioambientais gerados pela construção e funcionamento de uma hidrelétrica, este trabalho teve como objetivo analisar as informações socioambientais divulgadas pela empresa Norte Energia S.A., a partir da construção de uma proposta de shadow e silent reports. Foram selecionados os seguintes pontos para análise: o tratamento das contingências socioambientais; mitigação dos impactos ambientais – o impacto na ictiofauna (peixes) da Volta Grande do Xingu; e crescimento populacional do município de Altamira. Limitou-se um corte temporal de janeiro de 2013 a dezembro de 2013, com exceção de uma informação extraída em 03 de setembro de 2014, utilizada como mencionado na sessão 3 deste trabalho.</p>
<p> O relatório sombra mostra alguns dos processos movidos pelo MP/PA contra a empresa Norte Energia S.A. Ao se comparar com o relatório silencioso, percebe-se o reconhecimento desses processos na Demonstração Financeira de exercício social de 31 de dezembro de 2013, de acordo com as normas brasileiras de contabilidade. O relatório sombra e silencioso, construídos para essa conta, desempenham o seu papel e demonstram ao usuário o tratamento que a empresa empreende às suas contingências socioambientais. Pode-se afirmar que houve um gap menor de informação entre stakeholder e a Norte Energia S.A. por conta da obrigatoriedade tida pelo CPC 25 para a divulgação de ativos e passivos contingentes, mesmo os de caráter socioambiental. Por mais que a evidenciação socioambiental no Brasil seja exclusivamente voluntária (Rover et al., 2012), as exigências do CPC 25 quanto à divulgação das contingências atribui certo caráter compulsório às contingências socioambientais e a associação de alguns itens do relatório sombra ao relatório silencioso justifica a defesa da divulgação obrigatória tida por Maltby (1997) e Levy et al. (2010).</p>
<p> Nesta pesquisa foram reunidas informações que demonstram o impacto que a população de peixes vem sofrendo com a construção da UHE de Belo Monte, e consequentemente os indivíduos que dependem da mesma para sua sobrevivência, bem como o caráter dos projetos desenvolvidos pela Norte Energia S.A. para a mitigação desses impactos. O caráter experimental desses projetos de mitigação é o que mais preocupa os principais indivíduos atingidos por esses impactos, pois existe uma grande incerteza se tais projetos darão resultado ou não, ainda mais contando-se com a grande diminuição da vazão do volume de água no período das cheias. A construção do relatório sombra e silencioso cumpre seu papel no momento em que consegue fazer a ligação das informações de um para o outro e demonstrar mais conclusivamente esse caráter experimental dos projetos. Diferentemente da empresa estudada por Hamling et al. (2006), a Norte Energia S.A. discursa sempre a favor do meio ambiente e da sociedade que a cerca, porém, percebe-se uma diferença de interesses dos stakeholders e da empresa quanto às medidas de mitigação dos impactos da ictiofauna da Volta Grande do Xingu.</p>
<p> Além disso, o relatório sombra mostra um crescimento populacional de 40% de 2010 até o final de 2013 no município de Altamira, a cidade que foi mais atingida pela construção da UHE de Belo Monte na área de influência direta da usina. Já o relatório silencioso mostra um crescimento um pouco menor de 8% de 2010 até junho de 2014. A Norte Energia S.A. utilizou-se de uma projeção de crescimento populacional desenvolvida pelo IBGE para informar o crescimento do município de Altamira. Analisando a metodologia utilizada para o desenvolvimento dessa projeção, não se percebe a influência da construção da UHE de Belo Monte nos cálculos do IBGE, e sim uma relação direta do comportamento do crescimento populacional entre o censo de 2000 e de 2010. A construção da UHE de Belo Monte teve início em 2011, o que pode ter gerado resultados enviesados nos cálculos do IBGE. Esse ponto da análise é onde ficou mais evidente toda a lacuna entre a informação tida pelo stakeholder e a informação divulgada pela entidade. Fica em foco a seleção de informação favorável por parte da Norte Energia S.A. nessa situação, o que corrobora as afirmações de Collison et al. (2010), Moreira (2012) e Pereira, Luz &amp; Carvalho (2015) quanto à divulgação de informações positivas e ao caráter favorável para a entidade em detrimento e omissão de informações negativas e de caráter desfavorável.</p>
<p> O desalinhamento de informações encontrado neste estudo é semelhante ao de Moreira (2012), em respeito à tendência de divulgação socioambiental de informações caráter positivo por parte das empresas. Isso aponta para um comportamento semelhante do gestor no que tange à decisão sobre a evidenciação voluntária de aspectos socioambientais. Este estudo contribui para os achados de Gibson et al. (2001), Hamling et al., (2006), Zikri (2009), Dai (2010) e Moreira (2012), pois foram construídos um relatório sombra e um relatório silencioso a fim de atender a diversos stakeholders e contribuir com a transparência da evidenciação ambiental e social e a diminuição da lacuna da informação tida pela sociedade e a divulgada pela entidade, assim como o trabalho desses autores.</p>
<p> Acredita-se que o presente trabalho atingiu seu objetivo de analisar as informações socioambientais divulgadas pela empresa Norte Energia S.A., a partir da construção de uma proposta adaptada do shadow e silent reports. Dessa maneira diminuindo a lacuna existente entre as informações tidas pelos stakeholders e as divulgadas pela entidade. Além de representar uma força alternativa de informação contra essa seleção de “boas notícias” preconizadas por Gibson et al. (2001), Bebbington et al. (2007), Dey (2003), Ruffing (2007), Dai (2010), Collison et al. (2010) e Moreira (2012). </p>
<p> Para futuros estudos sugere-se explorar outros fatores socioambientais e impactos socioambientais gerados pela UHE de Belo Monte, como em outras empresas brasileiras. </p>
<p> Além de deixar sua contribuição, este trabalho deixa como sugestão para futuras explorações acadêmicas a compilação de relatórios sombra e silencioso de outros pontos de impactos socioambientais acarretados pela UHE de Belo Monte, pois os projetos de mitigação dos mesmos são os mais ambiciosos que já se viu na construção de uma hidrelétrica, além de incentivar esse tipo de exploração para outras empresas nacionais.</p>
</sec>
</sec>
</sec>
</sec>
</sec>
</sec>
</sec>
</sec>
</sec>
</body>
<back>
<ref-list>
<title>Referências</title>
<ref id="redalyc_471647049002_ref2">
<mixed-citation>Azzone,
G., Brophy, M., Noci, G., Welford, R., &amp; Young, W. (1997). A stakeholders'
view of environmental reporting. Long
Range Planning, 30(5), 699-709.</mixed-citation>
<element-citation publication-type="journal">
<source>A stakeholders' view of environmental reporting.</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref3">
<mixed-citation>Bebbington,
J., Brown, J., Frame, B., &amp; Thomson, I. (2007). Theorizing engagement: the
potential of a critical dialogic approach. Accounting,
Auditing &amp; Accountability Journal, 20(3), 356-381.</mixed-citation>
<element-citation publication-type="journal">
<source>Theorizing engagement: the potential of a critical dialogic approach.</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref4">
<mixed-citation>Beck,
A. C., Campbell, D., &amp; Shrives, P. J. (2010). Content analysis in
environmental reporting research: Enrichment and rehearsal of the method in a
British-German context. The British
Accounting Review, 42(3), 207-222.</mixed-citation>
<element-citation publication-type="journal">
<source>Content analysis in environmental reporting research: Enrichment and rehearsal of the method in a British-German context.</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref5">
<mixed-citation>Collison, D., Dey, C., Hannah, G., &amp; Stevenson, L. (2010).
Anglo-American capitalism: the role and potential role of social accounting. Accounting, Auditing &amp;
Accountability Journal, 23(8),
956-981.</mixed-citation>
<element-citation publication-type="journal">
<source>Anglo-American capitalism: the role and potential role of social accounting.</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref6">
<mixed-citation>Dai, B. (2010). Investigating
the impacts of shadow reports on the social and environmental reports of their
targeted corporations (Master
dissertation, Auckland University of Technology).</mixed-citation>
<element-citation publication-type="book">
<source>Investigating the impacts of shadow reports on the social and environmental reports of their targeted corporations</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref7">
<mixed-citation>Dey, C. (2003). Corporate “silent” and “shadow” social accounting. Social and Environmental Accountability Journal, 23(2), 6-9.</mixed-citation>
<element-citation publication-type="journal">
<source>Corporate “silent” and “shadow” social accounting.</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref8">
<mixed-citation>Fearnside,
P. M. (2010). As hidrelétricas de Belo Monte e Altamira (Babaquara) como fontes
de gases de efeito estufa. Novos Cadernos NAEA,12(2),
5-56.</mixed-citation>
<element-citation publication-type="journal">
<source>As hidrelétricas de Belo Monte e Altamira (Babaquara) como fontes de gases de efeito estufa</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref9">
<mixed-citation>Gibson, K., Gray, R., Laing, Y., &amp; Dey, C. (2001,
August). The Silent Accounts Project: Draft Silent and Shadow Accounts
1999-2000. In BAA Scottish
Group Conference, Stirling. Disponível em https://www.st-andrews.ac.uk/csear/.</mixed-citation>
<element-citation publication-type="confproc">
<source>The Silent Accounts Project: Draft Silent and Shadow Accounts 1999-2000.</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref10">
<mixed-citation>Hahn,
R., &amp; Kühnen, M. (2013). Determinants of sustainability reporting: a review
of results, trends, theory, and opportunities in an expanding field of
research. Journal of Cleaner
Production, 59, 5-21.</mixed-citation>
<element-citation publication-type="journal">
<source>Determinants of sustainability reporting: a review of results, trends, theory, and opportunities in an expanding field of research</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref11">
<mixed-citation>Hamling, A., Kololian,
C., Lloyd, Z.; Yuill, Z. (2006). Silent and Shadow Report: RyanAir. University
of St Andrews. Disponível em http://www.st-andrews.ac.uk/media/csear/app2practice-docs/CSEAR_ryanair2007.pdf.</mixed-citation>
<element-citation publication-type="webpage">
<source>Silent and Shadow Report: RyanAir. University of St Andrews.</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref12">
<mixed-citation>Holland, L., &amp;
Foo, Y. B. (2003). Differences in environmental reporting practices in the UK
and the US: the legal and regulatory context. The British Accounting Review, 35(1), 1-18.</mixed-citation>
<element-citation publication-type="journal">
<source>Differences in environmental reporting practices in the UK and the US: the legal and regulatory context</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref13">
<mixed-citation>Instituto Brasileiro de Geografia e Estatística (IBGE)
(2014). Estimativas da população
residente nos municípios brasileiros com data de Referência em 1o de
julho de 2014. Disponível em ftp://ftp.ibge.gov.br/Estimativas_de_Populacao/Estimativas_2014/nota_metodologica_2014.pdf.</mixed-citation>
<element-citation publication-type="webpage">
<source>Estimativas da população residente nos municípios brasileiros com data de Referência em 1o de julho de 2014.</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref14">
<mixed-citation>Leite, M., Amora, D., Kachani, M.,
Almeida, L., &amp; Machado, R. (2013, Dezembro 16). A batalha de belo Monte. Folha de S. Paulo. Disponível
em http://www1.folha.uol.com.br/especial/2013/belomonte/</mixed-citation>
<element-citation publication-type="newspaper">
<source>A batalha de belo Monte. Folha de S. Paulo.</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref15">
<mixed-citation>Levy,
D. L., Brown, H. S., &amp; De Jong, M. (2010). The Contested politics of
corporate governance the case of the global reporting initiative. Business &amp; Society, 49(1), 88-115.</mixed-citation>
<element-citation publication-type="journal">
<source>The Contested politics of corporate governance the case of the global reporting initiative</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref16">
<mixed-citation>Lins, L. D. S., &amp;
Silva, R. N. S. (2010). Responsabilidade Socioambiental ou Greenwash:
uma avaliação com base nos relatórios de sustentabilidade ambiental. Sociedade, Contabilidade e Gestão, 4(1).</mixed-citation>
<element-citation publication-type="journal">
<source>Responsabilidade Socioambiental ou Greenwash: uma avaliação com base nos relatórios de sustentabilidade ambiental.</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref17">
<mixed-citation>Maltby, J. (1997).
Setting its own standards and meeting those standards: voluntarism versus
regulation in environmental reporting. Business Strategy and the Environment, 6(2), 83-92.</mixed-citation>
<element-citation publication-type="journal">
<source>Setting its own standards and meeting those standards: voluntarism versus regulation in environmental reporting</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref18">
<mixed-citation>Monteiro, S. (2007). Factores
explicativos do grau de divulgação ambiental em grandes empresas a operar em
Portugal: análise multivariada. Conocimiento, innovación y emprendedores:
camino al futuro, 1005-1023.</mixed-citation>
<element-citation publication-type="book">
<source>Factores explicativos do grau de divulgação ambiental em grandes empresas a operar em Portugal: análise multivariada</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref19">
<mixed-citation>Moreira, F. N. (2012).
Shadow Report: A informação socioambiental à sombra do disclosure contábil no
setor elétrico. (Dissertação de Mestrado, Universidade Federal do Rio de
Janeiro, Rio de Janeiro, RJ, Brasil).</mixed-citation>
<element-citation publication-type="thesis">
<source>A informação socioambiental à sombra do disclosure contábil no setor elétrico.</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref20">
<mixed-citation>Pereira,
F. E., Morais Luz, J. R., &amp; Carvalho, J. R. M. (2015). Evidenciação das
Informações Ambientais das Empresas do Setor de Energia Elétrica do Brasil. Revista Evidenciação Contábil &amp;
Finanças, 3(2), 60-72.</mixed-citation>
<element-citation publication-type="journal">
<source>Evidenciação das Informações Ambientais das Empresas do Setor de Energia Elétrica do Brasil</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref21">
<mixed-citation>Raupp, F. M., &amp; Beuren, I. M. (2003). Metodologia da pesquisa aplicável às ciências
sociais. Como elaborar trabalhos
monográficos em contabilidade: teoria e prática, 3, 76-97.</mixed-citation>
<element-citation publication-type="book">
<source>Metodologia da pesquisa aplicável às ciências sociais. Como elaborar trabalhos monográficos em contabilidade: teoria e prática,</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref22">
<mixed-citation>Ribeiro, A. M. (2009). Evidenciação Ambiental: uma investigação transnacional dos reflexos de
diferentes marcos regulatórios sobre as práticas de evidenciação ambiental das
empresas do setor de petróleo e gás natural. (Dissertação de Mestrado,
Universidade Federal de Santa Catarina, Santa Catarina, SC, Brasil).</mixed-citation>
<element-citation publication-type="thesis">
<source>Evidenciação Ambiental: uma investigação transnacional dos reflexos de diferentes marcos regulatórios sobre as práticas de evidenciação ambiental das empresas do setor de petróleo e gás natural.</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref23">
<mixed-citation>Rosa, F. S., Ensslin,
S. R., Ensslin, L., &amp; Lunkes, R. J. (2011). Gestão
da evidenciação ambiental: um estudo sobre as potencialidades e oportunidades
do tema. Engenharia Sanitária Ambiental,
16(1), 157-166.</mixed-citation>
<element-citation publication-type="journal">
<source>Gestão da evidenciação ambiental: um estudo sobre as potencialidades e oportunidades do tema.</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref24">
<mixed-citation>Rosa, L. P., Sigaud, L., &amp; Rovere, E. L. (1995). Estado, energia elétrica e meio ambiente: o
caso das grandes barragens. COPPE.</mixed-citation>
<element-citation publication-type="book">
<source>Estado, energia elétrica e meio ambiente: o caso das grandes barragens</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref25">
<mixed-citation>Rover, S., Tomazzia, E. C., Murcia, F.
D. R., &amp; Borba, J. A. (2012). Explicações para a divulgação voluntária
ambiental no Brasil utilizando a análise de regressão em painel. Revista de
Administração, 47(2),
217-230.</mixed-citation>
<element-citation publication-type="journal">
<source>Explicações para a divulgação voluntária ambiental no Brasil utilizando a análise de regressão em painel.</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref26">
<mixed-citation>Ruffing, L. (2007).
Silent vs. shadow reports: What can we learn from BP's sustainability report
versus the financial times? Social and Environmental Accounting Journal, 27(1), 9-16.</mixed-citation>
<element-citation publication-type="journal">
<source>Silent vs. shadow reports: What can we learn from BP's sustainability report versus the financial times?</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref27">
<mixed-citation>Sousa, W. L. (2000). Impacto ambiental de hidrelétricas:
uma análise comparativa de duas abordagens (Dissertação de Mestrado, Universidade
Federal do Rio de Janeiro, Rio de Janeiro, RJ, Brasil).</mixed-citation>
<element-citation publication-type="thesis">
<source>Impacto ambiental de hidrelétricas: uma análise comparativa de duas abordagens</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref28">
<mixed-citation>Zhouri, A., &amp; Teixeira, R. (2007). Desenvolvimento,
Conflitos Sociais e Violência no Brasil Rural: o caso das hidrelétricas. Ambiente e Sociedade, 119-135.</mixed-citation>
<element-citation publication-type="journal">
<source>Desenvolvimento, Conflitos Sociais e Violência no Brasil Rural: o caso das hidrelétricas.</source>
</element-citation>
</ref>
<ref id="redalyc_471647049002_ref29">
<mixed-citation>Zikri, M. (2009).
Silent and Shadow Account of Freeport Indonesia. MSc-Business with Management.</mixed-citation>
<element-citation publication-type="journal">
<source>Silent and Shadow Account of Freeport Indonesia.</source>
</element-citation>
</ref>
</ref-list>
</back>
</article>